
Intellisense Systems Inc.
Page 23
Installation Guide – AWARE Flood System
MONTHLY FLOOD SENSOR SITE INSPECTION CHECKLIST
INSPECTOR:
DATE:
For each sensor site, please check to following items and take note of any repair conducted during inspection
or future repairs that need to be made. Ensure that all inspections and validation measurements are properly
recorded in EDMs.
1.
AWARE FLOOD NODE
Make sure the flood sensor cable is attached
Make sure the zip ties for the cable is in place
If the camera is present:
Make sure the cable is attached
Make sure the camera is positioned facing water/desired view
Inspect for damage to solar panels
Make sure the solar panels are clear of debris/dirt
Check for signs of insects on the exterior to the AWARE Flood Node and remove. DO NOT OPEN.
Clear the surrounding area of ground foliage and branches that could impact the solar panels
2.
CONDUIT
Make sure conduit is secure:
To the post
With the ground stakes in place (if needed)
With zip ties or other means of securing conduit is near water
3.
WATER LEVEL PRESSURE (WLP) MODULE
Ensure the post is secure in ground
Ensure sensor is secure to the post
Make sure the conduit is secure to the post
Make sure the sensor is secure to the post
Clear any debris from the area
Record a validation measurement and time
NOTES:
Phone: 310-320-1827
Email: [email protected]
www.intellisenseinc.com
©2020 Intellisense Systems, Inc. All rights reserved. All other brands or names are the property of their respective holders.
INSTALL-AWARE Flood-02-2021