2. INSTALLATION 

 
 
To get detailed information about the installation process, please visit:  

https://intellimeter.ca/pages/downloads#videos

: Intellimeter i-meter®MF6 Installation & 

Troubleshooting and/or Intellimeter i meter®MF3 Installation & Troubleshooting. 
 

 

Verify the number of breakers is the same as the number of meters assigned for that panel board. 
Follow the installation drawings. Group the assigned modules to the identified panel board. 

 

Referring to the diagram below, CTs can be embedded in the distribution panel. If the customer has 
supplied a special compartment for the meter with their electrical panel, Intellimeter will install the 
meter and have the SPE-1000 field evaluation completed. Otherwise, the meter will be installed in 
an external enclosure to be mounted near the electrical panel for ease of servicing. 

 

Install the modules into their appropriate position. 

 

Voltage connectors are fixed to the meter PCB. Contractor has to wire to the meter board and use 
the wire terminals (spade connectors) provided. 

 

Terminate the voltage reference chain to the designated, 15Amp breaker and ensure the proper 
phasing retained as per drawings. 

 

Install the communication connectors to the meter modules and dress the wires they are protected 
from damage during feeder and branch circuit installation.

 

MF series can be provided with a pulse 

output cable upon request. 

 

Communication cable is to be terminated to a junction box outside of the panel board by the 
electrical contractor. 

 

Review general information and wiring diagram.  

 

Carefully read all the WARNING signs and notes. 

 

Check meter serial number and other information on the meter. 

 

All meter modules are assigned within the panel board and are identified with respect to position, 
or section of breakers. 

 

A label on the top of each unit indicates meter assignment. Follow the installation drawings that are 
supplied with the units. 

 

Do not leave the secondary CT open when current is flowing through the primary circuit. This 
applies to instrument CTs as ICI milliamp CTs are self-protected. 

 

Contact ICI if there has been a change made to the layout or if the assigned drawings do not match 
the actual distribution panel layout. 

 
 

Содержание i -meter MF3

Страница 1: ...Page 1 Intellimeter Canada Inc 1125 Squires Beach Road Pickering ON L1W 3T9 Tel 905 839 9199 Copyright 2020 MF Series Manual I METER MF SERIES INSTALLATION AND USER MANUAL...

Страница 2: ...TENTS 1 PRODUCT DESCRIPTION 4 1 1 Applications 4 1 2 Specifications 5 2 INSTALLATION 6 3 OPERATION AND TROUBLE SHOOTING 7 3 1 Metering Rules 7 4 STEPS TO OPERATE THE METER 9 5 CONFIGURATION 11 6 i met...

Страница 3: ...a return material authorization RMA number should be obtained from ICI STATEMENT OF CALIBRATION The accuracy and calibration of our instruments are traceable to Measurement Canada a division of Indust...

Страница 4: ...There are two models i meter MF3 1 3 meter with optional neutral current measurement i meter MF6 2 3 meters with optional neutral current measurement Measurement Canada California CTEP and CSA approve...

Страница 5: ...ing Rated VA 4 VA Service Type 1 2W 1 3W 2 3W 3 4W wye 3 3W Delta Current Transformers 80 100 mA output Self Shorting Protection Current Range 0 08 80mA 1 100mA Instrument Transformers Interface Yes P...

Страница 6: ...actor has to wire to the meter board and use the wire terminals spade connectors provided Terminate the voltage reference chain to the designated 15Amp breaker and ensure the proper phasing retained a...

Страница 7: ...rom LINE to LOAD Similarly the H1 is on the LINE SIDE All Intellimeter milli Amp current transformers 100 0 8A 200 0 1A 400 0 1A and 600 0 1A have self shorting protection built into the device They c...

Страница 8: ...e sequence Usually Line 1 Red or A phase Line 2 Black or B phase Line 3 Blue or C phase Neutral White Note Colour sequence may vary depending on the country and region Rule 3 When the metering system...

Страница 9: ...ON L1W 3T9 Tel 905 839 9199 Copyright 2020 MF Series Manual 4 STEPS TO OPERATE THE METER Step 1 Connect three phase voltage to Voltage Inputs terminals Step 2 Connect all CTs to CT Inputs according to...

Страница 10: ...Page 10 Intellimeter Canada Inc 1125 Squires Beach Road Pickering ON L1W 3T9 Tel 905 839 9199 Copyright 2020 MF Series Manual i meter MF6 series wiring diagram...

Страница 11: ...factory 6 i meter MF SERIES DISPLAY The i meter MF3 and the i meter MF6 have a three line LCD that shows both energy consumption and real time measurements Three line LCD 3x9 character i meter MF3 is...

Страница 12: ...i_meter 123456 1 2 1 4 0 9 5 V Pf L1 1 2 3 6 0 9 2 V Pf L2 1 2 4 8 0 9 8 V Pf L3 Line 1 Phase A Voltage Power Factor Line 2 Phase B Voltage Power Factor Line 3 Phase C Voltage Power Factor Screen 3 I...

Страница 13: ...e 3 Neutral Current 7 i meter MF SERIES COMMUNICATION The i meter MF series ModBus module enables the meter to communicate on a ModBus system It presents real time measurements such as voltage current...

Страница 14: ...eral information about the meter and the ModBus module This information is the identification data and it generally remains constant with the exception of the up time Configuration Parameters Modbus A...

Страница 15: ...NT32 x0 001A 41109 Current B UINT32 x0 001A 41111 Current C UINT32 x0 001A 41113 Watts A INT32 W 41115 Watts B INT32 W 41117 Watts C INT32 W 41119 Volt Amp A INT32 VA 41121 Volt Amp B INT32 VA 41123 V...

Страница 16: ...NT32 x0 001A 41209 Current B UINT32 x0 001A 41211 Current C UINT32 x0 001A 41213 Watts A INT32 W 41215 Watts B INT32 W 41217 Watts C INT32 W 41219 Volt Amp A INT32 VA 41221 Volt Amp B INT32 VA 41223 V...

Страница 17: ...s Name Format Unit Default 47001 THD IA Meter 1 UINT16 0 01 47021 THD IB Meter 1 UINT16 0 01 47041 THD IC Meter 1 UINT16 0 01 47061 THD IA Meter 2 UINT16 0 01 47081 THD IB Meter 2 UINT16 0 01 47101 TH...

Страница 18: ...3T9 Tel 905 839 9199 Copyright 2020 MF Series Manual Thank you for giving us the opportunity to serve you We appreciate your business and the confidence you have placed in us Please visit us https in...

Отзывы: