Connecting Harnessing
Engage® Zone Control Installation Manual
600840-000043, rev 1.4
Page 25 of 31
3.2. Installing Gateway Harness
1. Connect S2 of the gateway harness (353050-000032) into port A of the Gateway 300
(153010-000042).
2. Connect S3 of the gateway harness into port B of the gateway.
3.
2014 or newer air cart:
Connect S6 of the gateway harness into S2 of the diagnostic
adapter harness (353050-000047). Then, connect S1 of the diagnostic adapter harness
into the JD diagnostic port. The diagnostic port is located at the back of the air cart on
tow-between air carts, and on the front of the air cart on tow-behind air carts.
2013 or older air cart:
Unplug the CAN termination from the JD cart harness. The JD
cart harness is located at the back of the air cart on tow-between air carts, and on the
front of the air cart on tow-behind air carts. Connect S6 of the gateway harness into the
JD cart harness.
Figure 20: JD cart harness location (2013 or older air carts)
4.
2014 or newer air cart:
Plug the sealing plug (153510-000091) into S7 of the gateway
harness.
2013 or older air cart:
Plug the JD CAN termination into S7 of the gateway harness.
5. Connect S4 of the gateway harness to S1 of the bin harness (353050-000060).
6. Connect S9 and S10 of the gateway harness to S2 and S6 of the bin harness.
7. Connect S8 of the gateway harness to S1 of the work switch extension harness
(353050-000011).