Portable Load Unit introduction

Portable Load Unit

2

3

Product specification

2.1

2.3

3.1

2.2

Dimensions PLU

205 × 155 × 250 mm

Dimensions RCD

45 × 26 × 10mm (Cable 50mm)

Mass PLU

5000g

Mass RCD 

30g

Input Voltage

24V

Operating Temperature

+5 to +35°C

Max Altitude

3000m

Certification 

CE and FCC

Input Electrical Connector

XT60 Male

Maximum Power Draw

900W

Status LED

Stop button

Reconditioning Dongle

Power connection point

Reconditioning Dongle

Portable Load Unit description

The Portable Load Unit (PLU) should be used with an Intelligent Energy Fuel 
Cell Power Module (FCPM) and the Reconditioning Dongle (RCD). The PLU 
enables the fuel cell stack to be kept at optimal performance, especially after 
periods of non-operation.

To allow the FCPM to be reconditioned to an optimal state, the function of 
both the PLU and RCD should be understood. The RCD issues commands to the 
FCPM which accelerates the reconditioning process. The PLU allows the FCPM 
to deliver maximum power in a controlled manner.

Compatible Intelligent Energy products for the Portable Load Unit

The Portable Load Unit can be used with the following fuel cell products from 
Intelligent Energy:

 · 650W FCPM
 · 800W FCPM

Reconditioning Dongle

Air inlet

Air exhaust

FCPM connection

Содержание Portable Load Unit

Страница 1: ...Portable Load Unit and Reconditioning Dongle User Manual Users must read all instructions provided and retain the manual for future reference Document No 1038842 ...

Страница 2: ...lications and use and storage of hydrogen on any sites Intelligent Energy warrants to the recipient and it will repair and replace any defective equipment resulting from the authorised use of the equipment provided Notwithstanding the above Intelligent Energy to the fullest extent permitted by law accepts no liability including liability in respect of any error or defects in the fuel cell system f...

Страница 3: ...with an Intelligent Energy Fuel Cell Power Module FCPM and the Reconditioning Dongle RCD The PLU enables the fuel cell stack to be kept at optimal performance especially after periods of non operation To allow the FCPM to be reconditioned to an optimal state the function of both the PLU and RCD should be understood The RCD issues commands to the FCPM which accelerates the reconditioning process Th...

Страница 4: ...h off the FCPM Disconnect PLU and RCD from the FCPM Fault Cause Action Red flash Over temperature fault 1 Switch unit off 2 Disconnect FCPM from PLU 3 Wait for 10mins to cool down 4 Restart PLU 5 If the fault persists Contact Intelligent Energy Product Support Over voltage on input fault LED Colour LED Mode Status Green Flash Operational dissipating power Amber Flash Operational not dissipating po...

Страница 5: ...com Intelligent Energy Charnwood Building Ashby Road Loughborough LE11 3GB UK www intelligent energy com End of life treatment and disposal EU Declaration of Conformity In accordance with EN ISO 17050 1 2010 9 10 Intelligent Energy Limited of Charnwood Building Holywell Park Ashby Road Loughborough Leicestershire United Kingdom LE11 3GB In accordance with the following Directive s 2014 30 EC The E...

Отзывы: