Platform Installations and Upgrades
Intel
®
Carrier Grade Server TIGI2U User Guide
68
Figure 46. Installing the Full Height PCI Riser Board
11. Install the PCI card(s). For instructions, see
“Installing a PCI Add-in Card.”
12. Install the chassis cover. For instructions, see
“Installing the Chassis Cover.”
Replacing the Power Interface Board
The power interface board routes power from the power supply to the rest of the server
system. To replace the power interface board, the PCI riser assembly and the power
supply must be removed. Use the following instructions to replace the power interface
board.
CAUTION
Before replacing any of the server boards, you must first take the
server out of service, turn off all peripheral devices connected to the
system, turn off the system by pressing the power button, and unplug
the AC power cord from the system or wall outlet or disconnect the
DC mains.
Содержание TIGI2U - Carrier Grade Server
Страница 32: ......