Application

Maximum Hot Water Temperature

Wash Hand Basin

43˚C

Table 2

Commissioning

         5.3  Measure and record the temperature of the water discharging from the valve for the 
                largest and smallest draw off point.

         5.4  Isolate the cold water supply to the valve and monitor the mixed water temperature.

         5.5  Measure and record the maximum mixed water temperature and the final temperature. 
                The final temperature found during the test should not exceed the values quoted in 
                table 2.

         5.6  Record all the equipment used during the commissioning.

    6.  Ensure that the application, to which the valve will be used, is appropriate for the approved 

         designation. 

    7.  The above information must be recorded and updated on every occasion when any work is 
    carried out on the valve.

In Service Testing

To ensure that the Thermostatic Mixer maintains a high level of protection, we advise the following in
service testing is followed (the same equipment used to commission the valve initially must be used in
the following tasks).

   1.   After a period of between 6 and 8 weeks after commissioning carry out the following.

         a)    Record the temperature of the hot and cold water supplies.

         b)    Record the temperature of the mixed water at the largest draw off flow rate.

         c)    Record the temperature of the mixed water at the smallest draw off flow rate.

   2.   If the mixed water temperature has changed significantly from the previous test results        
         (e.g. > 1 k), record the change and before re-setting the mixed water temperature check that:

         a)    All the strainers are clean 

         b)    All the check valves are in good working order

         c)    The isolation valves are fully open.

Содержание HTMDMCP

Страница 1: ...information as accurate as possible We cannot accept any responsibility should it be found that in any respect the information is inaccurate or incomplete or becomes so as a result of further develop...

Страница 2: ...3 Components Wall Mounted with Removable Spout 4 Components Deck Mounted 5 Components Deck Mounted with Removable Spout 6 Dimensions 7 Installation 8 Operation 9 Trouble Shooting 9 Re calibration 10 C...

Страница 3: ...t attempt to install your control mixer until the missing parts have been obtained Product Range HTMWMCP HTM safe touch thermostatic sequential wall mounted tap HTMDMCP HTM safe touch thermostatic seq...

Страница 4: ...egulator 3 Lever 4 Lever Retaining Screw 12 Hot Water Inlet Assembly including 5 l m flow regulator 5 Concealing Plate 6 Cold Water Inlet Tail Assembly 13 Hot Water Port Blanking Assembly 7 Hot Water...

Страница 5: ...Item Description Item Description 1 Body 18 Spout Retaining Screw 17 Spout 19 O Ring Components Wall Mounted with Removable Spout Additional Components Removable Spout 1 2 3 4 5 6 5 7 8 9 11 13 14 15...

Страница 6: ...3 Lever 4 Lever Retaining Screw 12 Hot Water Inlet Assembly including 5 l m flow regulator 5 Concealing Plate 6 Cold Water Inlet Tail Assembly 13 Hot Water Port Blanking Assembly 7 Hot Water Inlet Ta...

Страница 7: ...Item Description Item Description 1 Body 18 Spout Retaining Screw 17 Spout 19 O Ring Components Deck Mounted with Removable Spout 1 2 3 4 11 6 5 8 9 7 5 13 14 16 15 10 12 17 18 19 Additional Componen...

Страница 8: ...Intatec Ltd 2016 7 Dimensions Wall Mounted Dimensions Deck Mounted 37 G B 128 75 105 186 5 45 266 116 5 50 33 75 187 5 200 G B 50 33 100...

Страница 9: ...y pipes to the tap cold on the right hot on the left Fit the lever 3 to the tap using the grub screw 4 provided Please ensure that the hydraulic installation is completed and that all check valves are...

Страница 10: ...tored hot water supply Ensure that the boiler is still firing for combi boilers Adjust the boiler control to a minimum setting of 65 C not necessarily the best flow rate Temperature is too hot or when...

Страница 11: ...wn These two rings are used to prevent the temperature of the cartridge from being altered whilst in use The stop rings should be locked at either end of the operating cycle and will form a physical s...

Страница 12: ...this fitting is serviced at least once a year Only use genuine spare parts the full list is available on request by ringing the Technical Helpline number on the back page Removing Spout The HTMWMRS wa...

Страница 13: ...een removed disinfection or sterilisation can commence The spout can be sterilised in an Autoclave following standard sterilisation procedures The spout after disinfection and sterilisation should be...

Страница 14: ...uct and invalidate the product guarantee A Waste water flushed through outlet with hose connected 7 Flushing hose not supplied 90 OPEN CLOSE 1 Move handle to closed position Water must not pass throug...

Страница 15: ...9 Unscrew the connector plug using suitably sized spanner and refit the check valve and end cover 10 Repeat the procedure for the cold inlet side before opening both isolation valves REMOVE 1 Move han...

Страница 16: ...hot supply to start sterilization procedure 90 OPEN CLOSE 6A Turn to open position 7 Close the isolation valve 90 OPEN CLOSE 8 Refit the hot inlet plug into the hot position and the cold into the col...

Страница 17: ...been independently tested and approved as a TYPE 3 valve under the TMV3 scheme Technical Specification Application This thermostatic mixer has been independently tested by WRc and certified as meetin...

Страница 18: ...which the Thermostatic Mixing Valve is to be installed into must be thoroughly flushed and cleaned to remove any debris see page 13 which may be accumulated during the installation Failure to remove a...

Страница 19: ...nsure that the system is thoroughly cleaned and free from any debris prior to the commissioning of the valve See page 10 2 The commissioning of the temperature must be carried out using a suitably cal...

Страница 20: ...ated on every occasion when any work is carried out on the valve In Service Testing To ensure that the Thermostatic Mixer maintains a high level of protection we advise the following in service testin...

Страница 21: ...ng and 5 of this section the next in service testing should be carried out at a period of 24 to 28 weeks after initial commissioning b If a small change e g 1 2 C in the mixed water temperature is rec...

Страница 22: ...and supplier s name is presented with the defective product within the guarantee period The free of charge service may be refused if this information is not available The guarantee will not apply if...

Страница 23: ...Intatec Ltd 2016 22 Notes...

Страница 24: ...n Staffordshire ST18 0PF Tel 01889 272 180 Fax 01889 272 181 email sales intatec co uk web www intatec co uk E O E 10 08 16 To activate your product warranty please visit www intatec co uk and click o...

Отзывы: