© Intatec Ltd 2016
13
System Flushing Procedure
The water system must be thoroughly flushed before attempting to commission or operate this tap to
ensure all pipework is clean and free from any debris. This system flushing procedure allows the
process to be efficiently conducted with the tap installed. Failure to carry out effective system flushing
before commissioning or operating this product could damage or limit the performance of the
product and invalidate the product guarantee
.
A
Waste water flushed
through outlet with
hose connected
7 - Flushing
(hose not supplied)
90°
OPEN
CLOSE
1 - Move handle to closed position
Water must not pass through
the tap before completing
system flushing
2 - Ensure both isolation valves
are in the closed position
2A - Turn to closed
position
3 - Remove end cover from
the hot supply end of
the tap
1
2
4 - Carefully remove check valve
housing using the extraction
tool (
HTMSP20XX
) and rotating
anti-clockwise
5 - Screw in connector plug using
suitably sized spanner
6 - Attach hose connector
(HTMFLUSH)
90°
OPEN
CLOSE
6A - Turn to open
position
Hot
supply
pipework
flushed
Содержание HTMDMCP
Страница 23: ...Intatec Ltd 2016 22 Notes...