SAFETY INFORMATION
Please read the following carefully before starting work on this equipment.
A competent person should install this appliance in accordance with the installation instructions for
this appliance and all relevant local and national standards including the following:
-
Health & Safety at Work Act
-
IEE Regulations
-
Local & national Building Regulations
-
BS Codes of practice
-
Water Supply Regulations
All personnel should be provided with sufficient training in the safe use of this appliance. A warning
notice displayed next to the machine is often helpful in notifying users that the appliance contains
and dispenses near boiling water.
•
Care should be taken to avoid potential injury from burns & scalding whilst operating this
appliance.
•
In line with Health and Safety requirements we recommend a risk assessment be carried out
after the boiler has been installed.
•
This appliance is not intended for use by persons (Including Children) with reduced physical,
sensory or mental capabilities, or lack of experience and knowledge, unless they have been
given supervision or instruction concerning use of the appliance by a person responsible for
their safety. Children should be supervised to ensure they do not play with the appliance
•
Always disconnect the unit from the power supply before servicing.
•
The unit must be earthed.
•
Keep these instructions in a safe place near the unit for future reference
ENVIRONMENTAL
(Information on Disposal for Users of Waste Electrical & Electronic Equipment)
The “crossed out wheelie bin” symbol on this product means that discarded electrical and electronic
products should not be mixed with general waste. Disposing of the product correctly will help to save
valuable resources and prevent any potential negative effects on human health and the environment
which could otherwise arise from inappropriate waste handling. For proper treatment, recovery and
recycling of end-of-life products, please contact your dealer or supplier for further information, or
local authority for details of your nearest designated collection point.
DELIVERY CHECKLIST
Before starting installation, check that you have the following parts;
1.
Catering Boiler Unit
2.
Paper wall-mounting template
3.
Fitting Kit (screws & wall plugs etc.)
4.
3/4” Water Inlet Fitting (plastic nut, brass tube and rubber washer)
5.
2 x 15mm Push-fit couplings (use coupling c/w copper tube on waste/drain fitting)
6.
Installation & User Instruction Book