insigniarange.com
Last Modified: 27/01/2017
11
TO START
Make sure you have a clear space, remember when finished and in place you need access
to check your build and able to pull the shower out for servicing or should you have the need
to replace anything!
Take the shower tub and remove all the protective wrapping and fit the waste. In the side of
the waste supplied in the optional fitting kit you will notice a spigot not seen on an ordinary
waste. In most cases this is blanked yet should you have a steam version you need to gently
drill this out as this item is for the steam generator drainage and will be connected in the
instructions later.
Now please level the tray by firstly placing the tray in its final location and then using a spirit
level, adjust the tray feet accordingly. Once you are happy with the levelling of the tray, you
can pull it out to begin the main construction.
Step 1
Once you have successfully completed a dry run,
Then continue to place the separate side panels onto the bath, screw together the
angled back piece and the side panel using the
ST14 screws x4
We advise to run a bead of
silicone
along the vertical edge in
-
between the two back
panels and in
-
between.
Step 1
Содержание INS8058L
Страница 10: ...insigniarange com Last Modified 27 01 2017 10...
Страница 43: ...insigniarange com Last Modified 27 01 2017 10...