www.insigniarange.com
Last Modified: 03/04/2018
14
Step 5
Now attach your inner uprights to your front fixed glass panels by inserting these over
the thin rubber seals as shown by the arrows in the image.
Next screw the inner uprights to your curved rails using the
ST10
screws for the top
and
ST20
screws for the bottom. There are two screws on each side.
(please note that the front uprights will need a pilot hole drilled before screwing)
Step 6
Now meet the front of the shower with the back panels and screw together using the
ST12
and
SW9
washers
screws. You will need to align the panels and then use the drill
piece to create pilot holes for the screws, then continue to run a bead of
silicone
along
the inside of the front fixed glass
x2
x2
x2
x2
x2