background image

 

www.insigniarange.com

 

Last Modified: 26/01/2017

 

 22 

MK117L Control Panel Instructions

 

Button 1 (Light Bulb) 

 

Press 1x For Top Light 

 

Press 2x For Column Light 

 

Press 3x For All Lights 

 

Press 4x To Switch Off Lights 

 

 

Button 2 (Radio) 

 

On/Off 

 

 

Button 3 (Fan) 

 

On/Off 

 

 

Button 4 (Speaker) 

 

Volume Down 

 

 

Button 5 (Radio) 

 

Press once to activate manual tune 

 

Press and hold to activate auto scan 

 

 

Button 6 (Speaker) 

 

Volume Up 

 

Button 7 (Down Arrow) 

 

Channel select down/manual search down 

 

 

Button 8 (M) 

 

Access saved channels 

 

 

Button 9 (Up Arrow) 

 

Channel select up/manual search up 

 

 

Button 10 (Alarm) 

 

Activate Alarm 

 

 

Button 11 (Telephone) 

 

Answer telephone 

 

 

Button 12 (Lock) 

 

The control panel will automatically lock when not in use for a 
short time, hold this button down for 3 seconds until a beep is 
heard and this will unlock and reactivate the control panel for 
use 

 

 

PLEASE NOTE:

 

(when in lock mode the display will have 2 flashing lines on the 
display and the only button that will work is the alarm) 

 

Содержание GT9002L

Страница 1: ...nts Parts inside of your warranty contact www insigniarange co uk customerService aspx Spares Replacements Parts outside of your warranty contact 0844 800 3069 www insigniarange co uk WARRANTY REG NO __________________________ To claim your full 5 year warranty register your shower within 90 days of delivery at www insigniarange co uk warrantyreg aspx Standard 12 month warranty applies if outside ...

Страница 2: ... Electrical Requirements What s In The Boxes Screw Pack Contents Plumbing Requirements Schematics Starting The Installation Electric Box Connections Sealing and Water Testing MK117L Control Panel Instructions Help Book Information Parts list 3 5 6 8 9 10 11 20 21 22 23 24 ...

Страница 3: ...any years to come Like everything in order to obtain a first class product that will serve you well for many years the effort and correctness put into the assembly will reflect in the quality of your finish OUR BADGE RATING IN TERMS OF DIFFICULTY OF ASSEMBLY IS BASED ON CLIENT FEEDBACK 1 Badge Very easy 2 Badges Easy 3 Badges Moderate 4 Badges Harder than average 5 Badges Professional skills requi...

Страница 4: ...ED ELECTRICAN COMPANY TO COMPLETE THE CONNECTION FROM SHOWER TO THE HOUSE SUPPLY LAWS DEMAND IN MANY CASES YOU DO THIS AND YOUR WARRANTY IS VOID IN REGARDS TO THE ELECTRICAL ITEMS IF THIS IS NOT UNDERTAKEN YOURS AND OTHERS SAFETY IS PARAMOUNT NEVER ATTEMPT THIS YOURSELF REMEMBER These showers are designed to be free standing and movable from their location should you have the need to replace anyth...

Страница 5: ...ed two methods 1 Connect within current laws and IP directives using plug and RCD provided with steam version or supply one for non steam version 2 Preferred Wire into isolated fused feed connecting directly to the house consumer service box Remove the fitted plug and ensure the Consumer unit has capabilities to replace RCD feature if RCD is removed Always use protection against electrical surge Y...

Страница 6: ...e Gun Spirit Level Tape Measure Philips Screwdriver Electric Drill Adhesive Requirements Hardware Requirements Bacteria Resistant Sanitary Silicone for vertical joints RubberGum Plumbers Mait for waste joints A Hydro Massage Shower requires 2 x 1 Metre Braided Hose Not Supplied Not Supplied Not Supplied Supplied ...

Страница 7: ... assembled When we use the word DRY RUN this means you do not silicone anything just simply construct the shower align drill and screw everything together Once you are happy with the build take the unit apart and carry out the final fix What s In The Boxes Tray Box 1x Tray 1x Roof 2x Curved Rails 1 x AC DC 12V Adapter Glass Room 2x Door seals 2x Glass doors 2x fixed glass Column 1x Complete Column...

Страница 8: ...o replacement missing parts can be obtained free of charge during or after the build Any claims can only be within the timescale permitted 48 hours after delivery and always BEFORE build Product Code Description Quantity SP097 Door Handles 2 SP008 Door Wheels 8 ST20 20mm Screws 20 ST35 35mm Screws 10 ST14 14mm Screws 6 ST25 25mm Screws 10 SW9 Small Washers 20 DB9 Drill Piece 1 Note In some cases y...

Страница 9: ...er plumber The end delivery however must fall within the scope above Important Note Do not exceed 3 4 BAR pressure under any circumstances Warranty is void if so as damage will occur If you have a combi sup ply please use a pressure reducing valve if required to lower the BAR pressure to the shower Please Remember that this product is free standing and is designed to be pulled away from the wall T...

Страница 10: ...www insigniarange com Last Modified 26 01 2017 10 ...

Страница 11: ... the small hand back panel to the back column Once you are happy with the alignment run a bead of silicone up the edge and Rubbergum along the bottom of the panels and screw to gether using the ST20 please note if your column has a rubber seal at the bottom take the rubber off and apply silicone inside the rubber and replace Whilst the next steps show you how to assemble your shower we want to mak...

Страница 12: ...alignment run a bead of silicone up the edge and Rubbergum along the bottom of the panels and screw together using the ST20 Step 3 Front Fixed Uprights PLEASE NOTE The uprights have small grooves cut out please see diagram These are designed to go at the bottom connecting to the tray Please see next page for positioning on the tray ...

Страница 13: ...n the picture to the left PLEASE NOTE The screw head needs to bypass the OUTER hole If this does not occur please bore out the outer hole only by about 2 4mm Your front metal work should now look like this Step 3 Continued Please Note With the groove sitting on the tray you need to have the U shaped channel facing inwards to allow the glass to be inserted correctly ...

Страница 14: ...dge of the curved and the straight fixed glass panels and cut any excess of if required Step 4 Now attach your front metal work to the fitted back panels Once you are happy with the alignment run a bead of silicone up the edge and Rubbergum along the bottom of the panels and frame and screw together using the ST20 ...

Страница 15: ...then screw into place Step 6 With the frame now attached to the back panels locate and fix the glass panels into place by pushing them as per the arrows in the adjacent image Making sure the edge of the glass with the rubber seal fits into the grove tightly Now screw the glass retaining clips into place using the ST14 screws making sure the glass has a tight fit ...

Страница 16: ...ttom of the glass doors and ensure the wheels are at their lowest position and hang on the inner curved rails with the wheels facing the outside of the glass Once all wheels are fitted and on the rails you can adjust the wheels by turning the plastic bolt clockwise in which in turn will pull the wheels towards the track ensuring a secure a tight fit Now grease the track to ensure a smooth and long...

Страница 17: ...anels are pierced through the existing glass holes with a knife to provide an efficient smooth fitting and location of the accessories We recommend using a screwdriver on the smaller holes Hand Shower 1 Attach the chrome holder to the back wall via the 2 screws provided in the pack 2 Attach the chrome water outlet to the back of the centre column fixing it from the rear with the plastic hex nut 3 ...

Страница 18: ... strip ensuring the flap is facing the fixed glass panel Handle Ensuring that the inner thread is protruding out from the handle far enough place the handle on the outside of the door and secure by tightening the inner chrome knob to the protruding inner thread Monsoon Head Attach the grey hose from your valve to the inner black tube using PTFE tape please note this only needs to be hand tight Ove...

Страница 19: ... DIAL DOES NOT CORRESPOND TO THE APPROPRIATE DEVICE Turn on your water to the shower and note which output the water exits from then turn off the water and swap over the relevant hose Alternatively remove the outer chrome knob by removing the chrome cap and loosening the grub screw please ensure not to unscrew fully as this will drop within the chrome knob this is found on the opposite side to the...

Страница 20: ...arange com Last Modified 26 01 2017 20 Electric Box Connections Roof Light Fan Speaker Antenna Back Lights RJ11 Phone Connection 12V power Supply Connect the cables below to the corresponding devices on the shower ...

Страница 21: ...sty and condensate thus the inspection becomes very difficult Now on the OUTSIDE of the shower inspect each joint factory seal hose clip and jet by walking from one side and going around to the back and then to the other side finishing at the front If you have a small leak normally caused through insufficient sealer or air bubble on assembly dry the area thoroughly and reseal Please remember the l...

Страница 22: ...6 Speaker Volume Up Button 7 Down Arrow Channel select down manual search down Button 8 M Access saved channels Button 9 Up Arrow Channel select up manual search up Button 10 Alarm Activate Alarm Button 11 Telephone Answer telephone Button 12 Lock The control panel will automatically lock when not in use for a short time hold this button down for 3 seconds until a beep is heard and this will unloc...

Страница 23: ... contains many useful items such as is your parts warranty registered advice on cleaning servicing your shower cabin fault finding and many more items This is a MUST to read and not just HELP It saves time in nearly all cases avoiding contact with ourselves as most answers are there for a ready fix Simply visit www insigniarange co uk help aspx ...

Страница 24: ...T9002L 8 Flat front fixed glass Glass Left Hand Part Code Part Description SP063 Monsoon Shower head SP243 Fold down seat SP048 Massage jet 2 open ends SP048A Massage jet 1 open 1 closed SP123 Shower head holder SP159 Shower waste SP097 Chrome rectangular door han dles SP240 Glass Shelf SP072 Door stoppers SP008 Door Wheels SP060 Electrical extension cable SP003 Ring light SP038 Speaker SP007 Fan ...

Страница 25: ...e used in any way shape or form with out written permission from Maclean International Ltd Images are NOT permitted to be saved printed or uploaded Violation of copyright laws are punishable by law All images are registered with ImageTraker Insignia is a registered trademark of Maclean International Ltd ...

Страница 26: ...nts Parts inside of your warranty contact www insigniarange co uk customerService aspx Spares Replacements Parts outside of your warranty contact 0844 800 3069 www insigniarange co uk WARRANTY REG NO __________________________ To claim your full 5 year warranty register your shower within 90 days of delivery at www insigniarange co uk warrantyreg aspx Standard 12 month warranty applies if outside ...

Страница 27: ... Electrical Requirements What s In The Boxes Screw Pack Contents Plumbing Requirements Schematics Starting The Installation Electric Box Connections Sealing and Water Testing MK117L Control Panel Instructions Help Book Information Parts list 3 5 7 8 9 10 11 20 21 22 23 24 ...

Страница 28: ...any years to come Like everything in order to obtain a first class product that will serve you well for many years the effort and correctness put into the assembly will reflect in the quality of your finish OUR BADGE RATING IN TERMS OF DIFFICULTY OF ASSEMBLY IS BASED ON CLIENT FEEDBACK 1 Badge Very easy 2 Badges Easy 3 Badges Moderate 4 Badges Harder than average 5 Badges Professional skills requi...

Страница 29: ...ED ELECTRICAN COMPANY TO COMPLETE THE CONNECTION FROM SHOWER TO THE HOUSE SUPPLY LAWS DEMAND IN MANY CASES YOU DO THIS AND YOUR WARRANTY IS VOID IN REGARDS TO THE ELECTRICAL ITEMS IF THIS IS NOT UNDERTAKEN YOURS AND OTHERS SAFETY IS PARAMOUNT NEVER ATTEMPT THIS YOURSELF REMEMBER These showers are designed to be free standing and movable from their location should you have the need to replace anyth...

Страница 30: ...ed two methods 1 Connect within current laws and IP directives using plug and RCD provided with steam version or supply one for non steam version 2 Preferred Wire into isolated fused feed connecting directly to the house consumer service box Remove the fitted plug and ensure the Consumer unit has capabilities to replace RCD feature if RCD is removed Always use protection against electrical surge Y...

Страница 31: ...e Gun Spirit Level Tape Measure Philips Screwdriver Electric Drill Adhesive Requirements Hardware Requirements Bacteria Resistant Sanitary Silicone for vertical joints RubberGum Plumbers Mait for waste joints A Hydro Massage Shower requires 2 x 1 Metre Braided Hose Not Supplied Not Supplied Not Supplied Supplied ...

Страница 32: ... assembled When we use the word DRY RUN this means you do not silicone anything just simply construct the shower align drill and screw everything together Once you are happy with the build take the unit apart and carry out the final fix What s In The Boxes Tray Box 1x Tray 1x Roof 2x Curved Rails 1 x AC DC 12V Adapter Glass Room 2x Door seals 2x Glass doors 2x fixed glass Column 1x Complete Column...

Страница 33: ...o replacement missing parts can be obtained free of charge during or after the build Any claims can only be within the timescale permitted 48 hours after delivery and always BEFORE build Product Code Description Quantity SP097 Door Handles 2 SP008 Door Wheels 8 ST20 20mm Screws 20 ST35 35mm Screws 10 ST14 14mm Screws 6 ST25 25mm Screws 10 SW9 Small Washers 20 DB9 Drill Piece 1 Note In some cases y...

Страница 34: ...er plumber The end delivery however must fall within the scope above Important Note Do not exceed 3 4 BAR pressure under any circumstances Warranty is void if so as damage will occur If you have a combi sup ply please use a pressure reducing valve if required to lower the BAR pressure to the shower Please Remember that this product is free standing and is designed to be pulled away from the wall T...

Страница 35: ...www insigniarange com Last Modified 26 01 2017 10 ...

Страница 36: ...construct the shower align drill and screw everything together Once you are happy with the build take the unit apart and carry out the final fix TO START Make sure you have a clear space remember when finished and in place you need access to check your build and able to pull the shower out for servicing or should you have the need to replace anything Take the shower tub and remove all the protecti...

Страница 37: ...alignment run a bead of silicone up the edge and Rubbergum along the bottom of the panels and screw together using the ST20 Step 3 Front Fixed Uprights PLEASE NOTE The uprights have small grooves cut out please see diagram These are designed to go at the bottom connecting to the tray Please see next page for positioning on the tray ...

Страница 38: ... picture to the left PLEASE NOTE The screw head needs to bypass the OUTER hole If this does not occur please bore out the outer hole only by about 2 4mm Your front metal work should now look like this Step 3 Continued Please Note With the groove sitting on the tray you need to have the U shaped channel facing inwards to allow the glass to be inserted correctly ...

Страница 39: ...dge of the curved and the straight fixed glass panels and cut any excess of if required Step 4 Now attach your front metal work to the fitted back panels Once you are happy with the alignment run a bead of silicone up the edge and Rubbergum along the bottom of the panels and frame and screw together using the ST20 ...

Страница 40: ...then screw into place Step 6 With the frame now attached to the back panels locate and fix the glass panels into place by pushing them as per the arrows in the adjacent image Making sure the edge of the glass with the rubber seal fits into the grove tightly Now screw the glass retaining clips into place using the ST14 screws making sure the glass has a tight fit ...

Страница 41: ...ttom of the glass doors and ensure the wheels are at their lowest position and hang on the inner curved rails with the wheels facing the outside of the glass Once all wheels are fitted and on the rails you can adjust the wheels by turning the plastic bolt clockwise in which in turn will pull the wheels towards the track ensuring a secure a tight fit Now grease the track to ensure a smooth and long...

Страница 42: ...anels are pierced through the existing glass holes with a knife to provide an efficient smooth fitting and location of the accessories We recommend using a screwdriver on the smaller holes Hand Shower 1 Attach the chrome holder to the back wall via the 2 screws provided in the pack 2 Attach the chrome water outlet to the back of the centre column fixing it from the rear with the plastic hex nut 3 ...

Страница 43: ... strip ensuring the flap is facing the fixed glass panel Handle Ensuring that the inner thread is protruding out from the handle far enough place the handle on the outside of the door and secure by tightening the inner chrome knob to the protruding inner thread Monsoon Head Attach the grey hose from your valve to the inner black tube using PTFE tape please note this only needs to be hand tight Ove...

Страница 44: ... DIAL DOES NOT CORRESPOND TO THE APPROPRIATE DEVICE Turn on your water to the shower and note which output the water exits from then turn off the water and swap over the relevant hose Alternatively remove the outer chrome knob by removing the chrome cap and loosening the grub screw please ensure not to unscrew fully as this will drop within the chrome knob this is found on the opposite side to the...

Страница 45: ...arange com Last Modified 26 01 2017 20 Electric Box Connections Roof Light Fan Speaker Antenna Back Lights RJ11 Phone Connection 12V power Supply Connect the cables below to the corresponding devices on the shower ...

Страница 46: ...sty and condensate thus the inspection becomes very difficult Now on the OUTSIDE of the shower inspect each joint factory seal hose clip and jet by walking from one side and going around to the back and then to the other side finishing at the front If you have a small leak normally caused through insufficient sealer or air bubble on assembly dry the area thoroughly and reseal Please remember the l...

Страница 47: ...6 Speaker Volume Up Button 7 Down Arrow Channel select down manual search down Button 8 M Access saved channels Button 9 Up Arrow Channel select up manual search up Button 10 Alarm Activate Alarm Button 11 Telephone Answer telephone Button 12 Lock The control panel will automatically lock when not in use for a short time hold this button down for 3 seconds until a beep is heard and this will unloc...

Страница 48: ... contains many useful items such as is your parts warranty registered advice on cleaning servicing your shower cabin fault finding and many more items This is a MUST to read and not just HELP It saves time in nearly all cases avoiding contact with ourselves as most answers are there for a ready fix Simply visit www insigniarange co uk help aspx ...

Страница 49: ...s Glass Right hand Internal Items External Items Part Code Part Description SP063 Monsoon Shower head SP243 Fold down seat SP048 Massage jet 2 open ends SP048A Massage jet 1 open 1 closed SP123 Shower head holder SP159 Shower waste SP097 Chrome rectangular door han dles SP240 Glass Shelf SP072 Door stoppers SP008 Door Wheels SP060 Electrical extension cable SP003 Ring light SP038 Speaker SP007 Fan...

Страница 50: ...e used in any way shape or form with out written permission from Maclean International Ltd Images are NOT permitted to be saved printed or uploaded Violation of copyright laws are punishable by law All images are registered with ImageTraker Insignia is a registered trademark of Maclean International Ltd ...

Отзывы: