www.insigniashowers.com
Last Modified: 20/09/2021
02
Contents
Installation Assistance
3
Thank you for your purchase
4
Tips for assembly
5
Braided Hose QR Code/Link
6
Electrical/Pressure/Tool requirements
7
Box contents
8
Installing the Waste and Levelling the Tray
9
Connecting the Framework
10
Applying RubberGum
11
Installing the Left Back Panel and Side Panel
12
Installing the Front Left Corner Upright
13
Connecting the Framework into the Upright
15
Installing the AMI System
16
Installing the Column
17
Installing the Front Right Corner Upright
18
Installing the Right Side Panel
20
Installing the Right Back Panel
22
Installing the Door Handles, Seals and Magnets
23
Installing the Roof
24
Installing the Fixed Glass Panel
25
Installing the Seals
26
Installing the Accessories
27
Installing the Door Wheels
28
Water Valve Connections
29
Control Panel Connections
30
Steam Generator Connections
31
Signing off your shower
33
Control Panel Operating Instructions
34
Spare Parts List
36
Steam Room & Shower Safety Guide
37
Steam Room Usage Guide
38
How to use AMI System
39
Bathroom Electrical Zones
40
WEEE Compliance Statement
42
Содержание 1050
Страница 6: ...www insigniashowers com Last Modified 20 09 2021 06 ...
Страница 18: ...www insigniashowers com Last Modified 20 09 2021 18 Step 9 Corner post to framework connection ...
Страница 20: ...www insigniashowers com Last Modified 20 09 2021 20 Step 10 Connecting the right side panel ...
Страница 24: ...www insigniashowers com Last Modified 20 09 2021 24 Step 13 Connecting the roof 1 ST8 x4 ...
Страница 25: ...www insigniashowers com Last Modified 20 09 2021 25 Step 14 Fixed Glass Connection ST16 3 5 x2 DB 9 ...
Страница 30: ...www insigniashowers com Last Modified 20 09 2021 30 Step 18 Control Panel Connections Power Supply ...
Страница 40: ...www insigniashowers com Last Modified 20 09 2021 40 Bathroom Electrical Zones ...
Страница 43: ...www insigniashowers com Last Modified 20 09 2021 43 ...