![Inscape Data Link Power LPS2400 Скачать руководство пользователя страница 4](http://html1.mh-extra.com/html/inscape-data/link-power-lps2400/link-power-lps2400_user-manual_2065279004.webp)
Page | 4
Chassis Power Connection
Before connecting or disconnecting ground or power wires to the chassis, ensure that power is
removed from the device. To ensure that all power is OFF, locate the circuit breaker on the
panel board that services the device, switch the circuit breaker to the OFF position, and tape the
switch handle of the circuit breaker in the OFF position.
Work During Lightning Activity
Do not work on the system or connect or disconnect cables during periods of lightning activity.
Comply with Local and National Electrical Codes
Installation of the equipment must comply with local and national electrical codes
Do Not Exceed Input and Output Ratings
Do not operate the product to exceed the power input and output ratings.
This product Conforms to the following safety standards
Specification
Description
Regulatory Compliance
Products with the CE Marking are compliant with the 89/336/EEC
and 73/23/EEC directives, which include the safety and EMC
standards listed.
Radiation
CE mark, commercial
FCC Part 15 Class B
VCCI Class B
EN 55022 (CISPR 22), Class B
Safety
CE Mark Commercial
CE/LVD EN60950
UL 60950-1, TUV EN60950-1, IEC60950-1 Approved
Содержание Link Power LPS2400
Страница 12: ...Page 12...