‑7‑
Fundamental Safety Instructions
●
Check whether the packing is intact and whether there is damage, water seepage,
dampness, and deformation before unpacking.
●
Unpack the package by following the unpacking sequence. Do not strike the package
violently.
●
Check whether there is damage, rust, or injuries on the surface of the equipment and
equipment accessories before unpacking.
●
Check whether the package contents are consistent with the packing list before
unpacking.
Storage and Transportation
●
Large‑scale or heavy equipment must be transported by qualified professionals using
specialized hoisting equipment. Failure to comply may result in personal injuries or
equipment damage.
●
Before hoisting the equipment, ensure the equipment components such as the front
cover and terminal blocks are secured firmly with screws. Loosely‑connected
components may fall off and result in personal injuries or equipment damage.
●
Never stand or stay below the equipment when the equipment is being hoisted by the
hoisting equipment.
●
When hoisting the equipment with a steel rope, ensure the equipment is hoisted at a
constant speed without suffering from vibration or shock. Do not turn the equipment
over or let the equipment stay hanging in the air. Failure to comply may result in
personal injuries or equipment damage.
●
Handle the equipment with care during transportation and mind your steps to prevent
personal injuries or equipment damage.
●
When carrying the equipment with bare hands, hold the equipment casing firmly with
care to prevent parts from falling. Failure to comply may result in personal injuries.
●
Store and transport the equipment based on the storage and transportation
requirements. Failure to comply will result in equipment damage.
●
Avoid storing or transporting the equipment in environments with water splash, rain,
direct sunlight, strong electric field, strong magnetic field, and strong vibration.
●
Avoid storing the equipment for more than three months. Long‑term storage requires
stricter protection and necessary inspections.
●
Pack the equipment strictly before transportation. Use a sealed box for long‑distance
transportation.
●
Never transport the equipment with other equipment or materials that may harm or
have negative impacts on this equipment.
Installation
●
The equipment must be operated only by professionals with electrical knowledge.
Содержание MD520 Series
Страница 1: ......
Страница 16: ...Components 15 Figure 2 2 Components of T5 to T6 models...
Страница 19: ...Components 18 Figure 2 5 Components of T10 to T12 models with AC output reactor...
Страница 27: ...System Structure 26 Figure 3 9 Control circuit terminals...
Страница 43: ...Options 42 Figure 5 2 Dimensions of MD500 AZJ A1T2 through hole mounting bracket and holes mm...
Страница 44: ...Options 43 Figure 5 3 Dimensions of MD500 AZJ A1T3 through hole mounting bracket and holes mm...
Страница 45: ...Options 44 Figure 5 4 Dimensions of MD500 AZJ A1T4 through hole mounting bracket and holes mm...
Страница 46: ...Options 45 Figure 5 5 Dimensions of MD500 AZJ A1T5 through hole mounting bracket and holes mm...
Страница 47: ...Options 46 Figure 5 6 Dimensions of MD500 AZJ A1T6 through hole mounting bracket and holes mm...
Страница 49: ...Options 48 Figure 5 8 Dimensions of MD500 AZJ A1T8 through hole mounting bracket and holes mm...
Страница 54: ...Options 53 The following figures shows the installed copper busbar...
Страница 115: ...Options 114 Figure 5 48 Dimension drawing of ferrite clamp...
Страница 120: ...Expansion Cards 119 Figure 6 1 Installation position of expansion cards...