background image

CLS 24.1/SV 

Montage- und Betriebsanleitung

CLS 24.1/SV 

Mounting and Operating Instructions

27             

When the power returns, all luminaires continue to 
stay on for the time specified. You can select any time 
between 1-15 minutes. Setting the time to 0 minutes 
disables the setting.

8.4.1.8. Manual reset

If the manual reset setting is enabled, when the power 
fails you can only perform a reset by manually con-
firming it on the device or by remote monitoring. This 
ensures that the emergency lighting stays on until the 
general lighting is switched back on and manual confir-
mation took place.

8.4.1.9. Central dimming

t

 

 program 

 

8

  

 programm device 

 

8

  

 

central dimming 

This option activates the option to centrally dim lumi-
naires in the final circuits. For more information on this 
function, see 

 6.3.8. Central dimming - page 20

8.4.1.10. Blocking…

t

 

 program 

 

8

  

 programm device 

 

8

  

 

blocking setup 

 

8

 

1

2

3

4

5

6

7

8

9 10 11 12 13 14 15 16 17 18 19 20

b l o c k i n g :
e m e r g e n c y   l i g h t  

m a i n s   l i g h t  

Specify which types of operation are blocked with  

 8.4.7. Blocking - page 31

 remote switches or by remote monitoring / MTB:
• Mains lighting
• Mains lighting and emergency lighting

 

If the mains lighting and emergency lighting 
option is activated when the device is blocked, 
the emergency lighting will remain off in the 
event of a power failure.

8.4.1.11. Device destination

t

 

 program 

 

8

  

 programm device 

 

8

  

 

destination

1

2

3

4

5

6

7

8

9 10 11 12 13 14 15 16 17 18 19 20

d e s t i n a t i o n :
E n t r y

Bei Rückkehr der Netzversorgung bleiben alle Leuchten 
für die angegebene Zeit noch eingeschaltet. Die Zeit ist 
zwischen 1 – 15 Minuten frei wählbar. 0 Minuten deakti-
viert die Einstellung.

8.4.1.8. Handrückschaltung

Bei aktivierter Handrückschaltung erfolgt nach einem 
Netzausfall die Rückschaltung erst durch eine manuelle 
Bestätigung am Gerät oder per Fernüberwachung. Dies 
gewährleistet, dass das Notlicht so lange eingeschaltet 
bleibt, bis die Allgemeinbeleuchtung wieder eingeschal-
tet ist und eine manuelle Bestätigung erfolgt.

8.4.1.9. Zentrales Dimmen

t

 

 Programmierung 

 

8

  

 Geräteprog. 

 

8

  

 

Zentrales Dimmen

Diese Option aktiviert die Möglichkeit der zentralen 
Dimmung von Leuchten in den Endstromkreisen. Weitere 
Informationen zu dieser Funktion 

 6.3.8. Zentrales Dim-

men - Seite 20

8.4.1.10. Blockieren von …

t

 

 Programmierung 

 

8

  

 Geräteprog. 

 

8

  

 

Blockieren von … 

 

8

 

1

2

3

4

5

6

7

8

9 10 11 12 13 14 15 16 17 18 19 20

B l o c k i e r e n   v o n :
N o t l i c h t  

D a u e r l i c h t  

Festlegung welche Betriebsarten über 

 8.4.7. Blockie-

rung - Seite 31

 Fernschalter oder per Fernüberwachung / MTB blockiert 
werden:
• Dauerlicht (DL)
• Dauerlicht (DL) und Notlicht (NL)

 

Bei Aktivierung der Option Dauerlicht und Not-
licht bleibt im blockierten Gerätezustand das Not-
licht während eines Netzausfalls aus!

8.4.1.11. Gerätezielort

t

 

 Programmierung 

 

8

  Geräteprog. 

 

8

  

 

Zielort

1

2

3

4

5

6

7

8

9 10 11 12 13 14 15 16 17 18 19 20

Z i e l o r t :
E i n g a n g s b e r e i c h

Содержание CLS 24.1

Страница 1: ...heitstechnik GmbH Mounting and Operating Instructions Emergency Lighting Device CLS 24 1 7Ah CLS 24 1 CLS 24 1 Power Montage und Betriebsanleitung Notlichtversorgungsger t CLS 24 1 7Ah CLS 24 1 CLS 24...

Страница 2: ......

Страница 3: ...3 Montage und Betriebsanleitung Notlichtversorgungsger t CLS 24 1 7Ah CLS 24 1 CLS 24 1 Power Mounting and Operating Instructions Emergency Lighting Device CLS 24 1 7Ah CLS 24 1 CLS 24 1 Power...

Страница 4: ...achung 50 12 4 Protokolle zu wiederkehrenden Pr fungen 51 Anhang 52 A Kopiervorlage f r die Anlagendokumentation 52 B Stromaufnahmetabellen 56 C Leitungsl ngen 56 D Kundendienst 57 Contents 1 General...

Страница 5: ...connected lumi naires is corrected a function test must be carried out to reset the fault indication 8 3 1 Running a function test page 24 1 Allgemeine Hinweise 1 1 Symbolerkl rung Sicherheitsrelevan...

Страница 6: ...interrupted for an extended period of time the battery circuit must be disconnected by removing the battery fuse in accordance with the operating instructions 7 Commissioning the CLS device page 21 C...

Страница 7: ...odule INOLan the CLS sys tem is monitored with the INOTEC software INOView 4 Produktbeschreibung Die dezentrale INOTEC Notlichtanlage CLS 24 1 ist ein Versorgungsger t in Schutzklasse I f r den Betrie...

Страница 8: ...in On St rung Failure SK 3 Ein On St rung Failure SK 4 Ein On St rung Failure Netz N L LSA1 N L LSA2 N L LSA3 N L LSA4 L PE N R T G IBa IBp IBp 24V T FS SL 24V Opt Stoer Betr Bat B SK1 SK2 SK3 SK4 1 2...

Страница 9: ...Operation Batt Betrieb Batt Operation St rung Failure Lade St rung Charge Failure SK 1 Ein On St rung Failure SK 2 Ein On St rung Failure SK 3 Ein On St rung Failure SK 4 Ein On St rung Failure Netz...

Страница 10: ...fuse 5AT AV 50A Noise level 0 dB Dimensions 345 x 245 x 112 Weight 9 6 kg Battery 24V 7 2Ah Battery power 1h 2 7A 3h 1 7A Dimensioned drawing 5 Technische Daten 5 1 CLS 24 1 7Ah Anschlussspannung 230V...

Страница 11: ...7 kg Batterie 24V 12Ah 24V 24Ah Batteriestrom 1h 6 6A 3h 2 9A 8h 1 3A 1h 6 6A 3h 5 8A 8h 2 6A Ma bild 5 2 CLS 24 1 Connection voltage 230V AC 10 Terminal mains supply 4 mm Mains fuse 5AT AV 1500A Outp...

Страница 12: ...e CLS 24 1 und CLS 24 1 7Ah is supplied with batteries installed The emergency lighting device CLS 24 1 Power is sup plied without installed batteries 5 3 CLS 24 1 Power Anschlussspannung 230V AC 10 K...

Страница 13: ...s have to be mounted on the top of the lower batteries if 4 batteries are installed in the steel cabinet 6 1 Ger t CLS 24 1 Nach dem Auspacken entfernen Sie im lie genden Zustand die vordere Schraube...

Страница 14: ...Bp IBp 24V T FS SL 24V Opt Stoer Betr Bat B SK1 SK2 SK3 SK4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Betrieb Operation Batt Betrieb Batt Operation St rung Failure Lade St rung Charge Failure...

Страница 15: ...htung und Sicher heitsleuchten gemeinsam geschaltet werden so kann unten stehende Schaltung angewendet werden Die Ein g nge sind f r 230V ausgelegt Dabei k nnen jeder ein zelnen Leuchte bis zu zwei Sc...

Страница 16: ...berwachung anzuschlie en Bei Ausfall wird die 24V Stromschleife unterbrochen und alle Leuchten der Sicherheitsbeleuch tung schalten in den Notlichtbetrieb Bei berwachung von mehreren Unterverteilern...

Страница 17: ...eral lighting General lighting General lighting Anschluss bei berwachung mit dreiphasigem Netz Supply monitoring in three phase installation Letzte DP Zener abschluss Last DP Zener diode termination s...

Страница 18: ...max 500m min 0 5mm Bei der Angabe der Leitungsl nge handelt es sich um die max Gesamtl nge Diese beinhaltet alle Leitungsstr nge incl Stiche Ein gleichzeitiger Betrieb von RTG Bus und INO Web oder IN...

Страница 19: ...kte des Fernschalters sind werksseitig gebr ckt ber diesen ist es m glich die Dauerlichtleuchten des Systems zu blockieren Potentialfreie Meldekontakte max 24V 1A DC An den 24V Ausgangsklemmen kann ei...

Страница 20: ...ieb schalten die Leuchten automatisch auf 100 HUB Switch InoWeb Control CLS InoWeb CLS InoWeb CLS InoWeb CLS InoWeb CLS InoWeb HUB Switch CLS InoWeb max 100m max 100m max 100m max 100m max 100m max 10...

Страница 21: ...with monitoring loop function deactivated Remote switch with monitoring loop function deactivated Emergency lighting delay 0 minutes Manual reset deactivated All electric circuits are activated 7 Inbe...

Страница 22: ...ilure Lade St rung Charge Failure Ein On St rung Failure Ein On St rung Failure Ein On St rung Failure Ein On St rung Failure F T C L S 2 4 V B e t r i e b U 2 7 5 V I 0 0 A 8 Use 1 2 3 4 5 6 7 8 9 10...

Страница 23: ...4 1 Pr fbuch anzeigen 34 5 4 2 Pr fbuch ausgeben 35 5 4 3 Pr fbuch l schen 35 6 Blockierung aufheben 36 8 2 Menu structure Press OK to go to the main menu 3 Test menu 3 1 Running a function test 24 3...

Страница 24: ...st to run on The CLS system will then start the function test at the specified time each week 8 3 Testmen 8 3 1 Funktionstest starten Im Funktionstestmodus schaltet das Ger t in den Bat teriebetrieb u...

Страница 25: ...ntralen berwachung des CLS Ger tes ber das Meldetableau wird in diesem Men punkt die Ger te adresse vergeben 0 32 Die Einstellung 0 deaktiviert die Datenkommunikation f r das Meldetableau 8 3 6 Automa...

Страница 26: ...hleife Seite 16 8 4 1 7 Notlicht Nachlauf 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 E i n s t e l l e n d e r N o t l i c h t N a c h l a u f Z e i t 1 0 m i n If the system is monitored usin...

Страница 27: ...ion t program 8 programm device 8 destination 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 d e s t i n a t i o n E n t r y Bei R ckkehr der Netzversorgung bleiben alle Leuchten f r die angegeben...

Страница 28: ...2 13 14 15 16 17 18 19 20 c i r c u i t 1 p r e s s O K t o d e o r a c t i v a t e X X X Faults in deregistered circuits are not displayed In dem Ger t kann ein Zielort mit maximal 20 Zeichen hinterl...

Страница 29: ...r the Config luminaires menu You can choose between 3 operating modes for each luminaire 8 4 2 2 Stromkreis Zielorte Zu jedem Endstromkreis kann noch ein Zielorttext ein gegeben werden Dazu w hlen Sie...

Страница 30: ...ered luminaire in the active circuit During destination description input all con nected luminaires switch to maintained light 8 4 3 1 Bereitschaftslicht BL Im Normalbetrieb ist die Leuchte ausgeschal...

Страница 31: ...stests notwendig 8 4 7 Blockierung t Programmierung 8 Blockierung 8 Das Ger t blockiert die im Optionsmen 8 4 1 10 Blockieren von Seite 23 angegebenen Betriebsarten Dauerlichtbetrieb oder Dauer und N...

Страница 32: ...ymbol The name must be no longer than 8 characters 8 4 8 INOSTICK 8 4 8 1 Konfiguration laden t Programmierung 8 INOSTICK 8 Konfig laden 8 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 W h l e n...

Страница 33: ...n m a i n e n t r a n c e X X X X X X X Press 8 to display additional information about the luminaire such as the individual addresses and switching modes Falls der Dateiname schon vorhanden ist so m...

Страница 34: ...ts are stored in the logbook 8 5 4 1 Displaying the logbook t info 8 logbook 8 display logbook 8 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 L e u c h t e 3 S K 2 I n d A d r 1 3 4 1 2 Taste ES...

Страница 35: ...logbook 8 Use this command to delete the entire contents of the logbook 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 E i n t r a g N r 2 5 3 D a t u m 1 2 0 6 2 0 0 8 U h r z e i t 1 4 4 8 2 4 F...

Страница 36: ...ei einer Leuchtenst rung berpr ft werden Individuelle Adresse korrekt Leuchtmittel OK Spannung am Eingang der Leuchte vorhanden 24V DC Elektronik defekt Leuchtenst rungen werden nach erfolgter Behebun...

Страница 37: ...nterverteilungen berwacht wer den so m ssen die Klemmen SL SL gebr ckt sein Mittels einer Br cke zwischen SL SL kann die Funktionsf higkeit der Stromschleife berpr ft werden 9 2 Battery fault 1 2 3 4...

Страница 38: ...d wird die Anlage mit Standort und Sta tusanzeigen wie Batteriestrom und Batteriespannung sowie den Zust nden der einzelnen Leuchten in den vier Stromkreisen dargestellt 10 INOWeb You can use the INOW...

Страница 39: ...n Leuchten und dessen Zielorttext 10 2 St rungsausdruck Ein St rungsausdruck erfolgt ber die Druckfunktion des Webbrowsers Ein Ausdruck der Seite ist ber Datei Drucken m glich You can use the followin...

Страница 40: ...terial Leuchte 07 OK Besprechungsraum Leuchte 08 OK Ausgang S dseite Leuchte 09 OK R107 Einkauf Leuchte 10 OK R103 Entwicklung Stromkreis 2 OK Lager Stromkreis 3 OK Stromkreis 4 OK 10 3 Automatic emai...

Страница 41: ...the following values Bits per second 9600 Data bits 8 Parity None Stop bits 1 Flow control None 10 4 Programmierung Die Programmierung des Moduls erfolgt ber die serielle Schnittstelle im CLS System m...

Страница 42: ...up 5 Normally the board will automatically negotiate with the network hub or switch to determine the Ethernet duplex setting however some hubs do not support autonegotiation In this case the Eth ernet...

Страница 43: ...M connectme_lsk APPLICATION INOWeb APP SetupDialog 1 3 NETWORK INTERFACE PARAMETERS IP address on LAN is 192 168 100 200 LAN interface s subnet mask is 255 255 255 0 IP address of default gateway to o...

Страница 44: ...und kann nicht ge ndert werden Eingabe Passwort HTML Seite TimeOut abwarten keine nderung Eingabe max 40 Zeichen Orts Bezeichnung TimeOut keine nderung Eingabe Ziffer nach welchem Ereignis E Mail ver...

Страница 45: ...tgelegt werden Dieses wird zum Zugriff auf die Webseiten ben tigt Der Standarduser ist WEBUSER Durch Eingabe eines Leerzeichen erfolgt keine Passwortabfrage bei Aufruf der Informationsseite If nothing...

Страница 46: ...Einstellungen sind zum automa tischen Versenden von Emails an die angegebenen Email Adressen Im Feld Aktuelle Email Ereignisse k nnen bei folgenden Ereignissen eine automatische Email verschickt werde...

Страница 47: ...t entpackt wurde kann es ohne Installation gestartet werden Ein gr ner Haken neben dem Feld Apache deutet an dass der Webserver gestartet wurde Unter Settings k nnen Einstellungen zum Starten des Webs...

Страница 48: ...rs welche im Internet zu finden ist 11 INOLan ber eine optional integrierte Netzwerkschnittstelle INOLan wird das CLS System mittels der INOTEC Soft ware INOView berwacht und Zustands nderungen in ein...

Страница 49: ...unction check it must be possible to operate all safety lights in battery mode and each light must be checked to ensure that it functions 12 Pr fungen Das Notlichtger t ist nach den national g ltigen...

Страница 50: ...pection and monitoring points as well as their time intervals can be found in the operating instructions of the battery manu facturer concerned und jede Leuchte ist auf korrekte Funktion zu berpr fen...

Страница 51: ...bl cke sowie der gesamten Batterie bei Belastungsbeginn und ende Der schriftliche Nachweis ber die j hrliche War tung ist die Grundlage f r m gliche Garantieanspr che 12 4 Protocols for repeat tests T...

Страница 52: ...om Power A A Zielort max 20 Zeichen einschl Leerzeichen Destination max 20 characters including spaces Gesamtstrom Total power Leuchten Typ Luminaries Type Dim 2 Dim 2 Kanal Nr 2 Channel no 2 Dim 1 Di...

Страница 53: ...m Power A A Zielort max 20 Zeichen einschl Leerzeichen Destination max 20 characters including spaces Gesamtstrom Total power Leuchten Typ Luminaries Type Dim 2 Dim 2 Kanal Nr 2 Channel no 2 Dim 1 Dim...

Страница 54: ...m Power A A Zielort max 20 Zeichen einschl Leerzeichen Destination max 20 characters including spaces Gesamtstrom Total power Leuchten Typ Luminaries Type Dim 2 Dim 2 Kanal Nr 2 Channel no 2 Dim 1 Dim...

Страница 55: ...m Power A A Zielort max 20 Zeichen einschl Leerzeichen Destination max 20 characters including spaces Gesamtstrom Total power Leuchten Typ Luminaries Type Dim 2 Dim 2 Kanal Nr 2 Channel no 2 Dim 1 Dim...

Страница 56: ...1018 SNP 1118 SN 8124 1 41 SN 9124 1 41 SN 804 SN 2518 4 x LED 1W 0 200A SNP 1016 SNP 1116 SN 6204 3 x LED 1W 0 150A SN 6114 SN 6109 SN 6205 SNP 7188 SNP 7286 2 x LED 1W 0 115A SNP 7186 SN 8124 1 11 S...

Страница 57: ...49 0 29 38 97 30 0 Fax 49 0 29 38 97 30 29 www inotec licht de info inotec licht de Specifications are subject to change D Kundendienst Bevor Sie den Kundendienst beauftragen berpr fen Sie bitte folg...

Страница 58: ...CLS 24 1 SV Montage und Betriebsanleitung CLS 24 1 SV Mounting and Operating Instructions 58...

Страница 59: ......

Страница 60: ...60 Sicherheitstechnik GmbH INOTEC Sicherheitstechnik GmbH Am Buschgarten 17 D 59 469 Ense Tel 49 29 38 97 30 0 Fax 49 29 38 97 30 29 info inotec licht de www inotec licht de 708 120 H 2017 05...

Отзывы: