SMC
20
the last element the water goes through before returning to the pool: always after the
filter and any the heat pumps, solar panels, etc. Use special glue for rigid PVC and wait
until it
completely dries before inserting the cell
.
If an automatic pH regulation system has been installed, the
injection of the product must take place unconditionally after the
cell. Otherwise, the electrodes will corrode due to the acid contact
and the warranty will be cancelled. Place the acid tank far from the
chlorinator and outside the pump room if you have a covered in-
ground pump room. Otherwise the corrosive vapor will corrode any
electronic component quickly.
Whenever it is possible, a by-pass installation with three valves is always
recommended. This allows the amount of water flowing through the cell to be adjusted
and the swimming pool to work with the cell housing disassembled. In any case, when
there is a pump with certain power, the by-pass is necessary to reduce the speed of
water through the cell housing to lower the pressure and avoid vibrations.
Although the vertical position is recommended, the cell housing may be installed
vertically or horizontally, according to the characteristics of your site. In the vertical
position, however, the cell housing can be opened without water spillage. Provide
enough room to unscrew the thread lock and extract the cell once the housing has been
installed.
NEVER INSTALL THE CELL WITH ITS SIDE WATER INLET FACING
UPWARDS
RECOMMENDED
WATER
FLOW
OK
VERTICAL
POSITION
RECOMMENDED
Содержание SMC Series
Страница 1: ...1 SMC E S P A Ñ O L ...
Страница 31: ...31 SMC E N G L I S H NOTES ...
Страница 32: ...SMC 32 ...