1.0 Installation
This section provides detailed procedures for properly
installing the
Multi-Point
Vertically Mounted Liquid Level
Float Switch.
Caution: If equipment is used in a manner not specified by
manufacturer, protection provided by equipment may be
impaired.
1.1
Unpacking
Unpack the instrument carefully. Inspect all units for dam-
age. Report any concealed damage to the carrier within 24
hours. Ensure that all components have been removed from
the packing material. Check all contents against the packing
list and report any discrepancies to the factory. Record the
serial and model numbers for future reference when order-
ing parts.
Model Number
Serial Number
1.2
Before You Begin
Caution: During the installation of the Multi-Point Vertically Mounted
Liquid Level Float Switch, the float area must be kept free
of metallic particles that might be attracted to the magnet
inside the float.
1.2.1 Site Preparation
1. Ensure that the length and the inside diameter of the
mounting is sized correctly for the Multi-Point Vertically
Mounted Liquid Level Float Switch.
1.2.2 Equipment and Tools
No special equipment or tools are required to install the
Multi-Point Vertically Mounted Liquid Level Float Switch.
The following items are recommended:
• Wrenches, thread sealant, gaskets and/or bolting as appro-
priate for the process connection.
Multi-Point Vertically Mounted Liquid Level Float Switch
1