                            8 

CONNECTION DIAGRAM 

CONNECTION & INITIAL TESTING 
 

Check input and output voltages of system, ensure that they match the equipment.   All loads should be 

isolated. 

Check polarity of all wiring.   Place temperature sensor probe near or on batteries. 

Plug in ac input and turn power on.   Both LEDs will light up after approx. 4 sec,   

“BATTERY”

 LED will 

go out after another 10 sec (since there is no battery connected).   DC output voltage should appear at both 
load and battery outputs (ensure screws are tightened down on the connector block).  

Turn off input power. 

Connect battery.    

Check that ECB (internal electronic circuit breaker) closes by shorting  together the 

BATTERY –ve 

and 

LOAD –ve  

terminals briefly.   You will hear a relay operate and both LEDs will light up.   If this does not hap-

pen,  there is a fault in the wiring or the internal battery protection fuse is ruptured (see Note 2 below).   The 
battery voltage will then appear at the load terminals and the 

“BATLOW” 

alarm relay energises.   The 

“MAINS 

FAIL” 

LED stays on for about 30 seconds. 

Connect load wiring to 

LOAD

and 

LOAD

terminals. 

Turn on ac power.    

After the batteries are fully charged,  check that the battery continues to power up the load when the 

input power is turned off. 
10 

Connect power (10-30VDC) to the protocol converter,  the red LED (“supply on”) will light up 

11 

Connect RS485 communication port on SRxxx i to MODBUS protocol converter (+PROTOCONMB).    
The green LEDs on both the power supply and the converter will flash to indicate that the comms. are 
working.   

12 

Connect the programming cable between the converter and your PC.   It is better to use a computer 
with a DB9 serial input as some serial to USB converters do not work.  For instructions on the protocol 
converter please refer to page 10. 

 

1  2  4

PD+  PC
    PD-

  

W G B

ALARMS

L+

L-

B+

B-

TEMPCO SENSOR FOR BATTERY

TX
RX
C

2
3

5

R

BK

W

RD
TD
SG

DB9

MC+ MC- MC

TO MODBUS 
NETWORK

+

-

RS+

RS-

10-30VDC
INPUT

+PROTOCONMB

TO LOAD

TO BATTERY

AC MAINS
INPUT

PC

PROGRAMMING
PORT

RS485

RS232

RS485

RJ45

SR xxx i

RESET

DB9 - front of female

See http://www.n-tron.com/pdf/
cat5ecableschemes.pdf  for 
colour coding & pinout 

Global Solutions Personal Focus 

Содержание No-Break SR250i 485 Series

Страница 1: ...1 www innovative co nz Phone 64 9 835 0700 Fax 64 9 837 3446 NZ Freephone 0800 654 668 AU Freephone 1800 148 494 Email info innovative co nz No BreakTM DC UPS with RS485 communications port 250W SR250...

Страница 2: ...in the installation to minimise the risk of ingress of water or dust Water will almost always cause instant failure the effects of dust are slower in causing failure of electronic equipment All elect...

Страница 3: ...AL OPERATION LOAD CURRENT PSU MAX CURRENT ELECTRONIC CIRCUIT BREAKER POWER CONVERSION BATTERY MANAGEMENT ALARM CIRCUIT BATTERY CURRENT SENSE OUTPUT VOLTAGE CURRENT LIMIT BATTERY CHARGE CURRENT CONTROL...

Страница 4: ...IRCUIT POWER CONVERSION I I LOAD CURRENT 1 5 x PSU MAX CURRENT MAINS FAIL BATTERY LOW ELECTRONIC CIRCUIT BREAKER REVERSE POLARITY FUSE BATTERY BATTERY TEMP SENSOR LOAD LOAD BATTERY LOAD LOAD OUTPUT VO...

Страница 5: ...ed battery from load Residual current drain on battery following ELVD 1 mA Alarm Normal System is in STANDBY mode due to 1 Operator pressed standby button or 2 PSU has internal fault Alarm Alarm PSU i...

Страница 6: ...ing if 50 C Self resetting Over voltage protection on output at 130 of nominal output voltage CISPR 22 EN55022 class A IEC950 EN60950 AS NZS3260 0 50 C ambient at full load De rate linearly 50 C to 0...

Страница 7: ...t Overload protection may be customized Please call us for further information DC Output Output V PSU Rated A Charge Limit A 1 Recomm Load A Peak load A SR250i 12 13 8 18 0 9 0 12 0 27 SR250i 24 27 6...

Страница 8: ...ppear at the load terminals and the BATLOW alarm relay energises The MAINS FAIL LED stays on for about 30 seconds 7 Connect load wiring to LOAD and LOAD terminals 8 Turn on ac power 9 After the batter...

Страница 9: ...measured as at step 3 above should be exactly the same on both the load and battery outputs FRONT PANEL LEDS WITH BUILT IN SWITCHES For full list of LED flash codes please refer to page 5 BATTERY SYST...

Страница 10: ...t may not detect a missing battery for up to this time 60 min BCT length of battery condition test 20 min Ret retest option N after a failed BCT further scheduled BCTs are inhibited Y after a failed B...

Страница 11: ...232 programming output Information on the power supply parameters and control of the battery condition test function are available using these outputs PROCEDURE Install Software from disk Power MBLink...

Страница 12: ...to the one of the available ports listed and click Open Com Port If it is the correct one in the Notice section Type should go from Notice to Success In Converter Information Click on Get Specs The c...

Страница 13: ...ture will be displayed as below In this screen you will also be able to control the battery condition test parameters under Battery Condition Test sec tion Go to Settings Diagnostics tab The power sup...

Страница 14: ...Mains Failure Possible Mains PSU Fail Battery in Bad Condition Communications to PSU Fail eg on LV disconnect Overload System Down Battery Missing Battery Low Possible Battery Missing Alarm State Sign...

Страница 15: ...42mm 253mm 80mm 162mm 150mm 80mm NOTE power cord protrudes The Standard ac approx 70mm 76 5 mm 60 mm 80mm 242mm 80mm 80mm 242mm 253mm 80mm 162mm 150mm 270mm 278mm NOTE power cord protrudes 172mm 80mm...

Страница 16: ...gies Ltd warrants its power supplies for 24 months two years from date of shipment against material and workmanship defects Innovative Energies liability under this warranty is lim ited to the replace...