Glocom GX-9 (FB250 Class) Operating Manual
3
G
G
G
G
ETTING
ETTING
ETTING
ETTING
SSSS
TARTED
TARTED
TARTED
TARTED
I
NTRODUCTION TO
G
ETTING
S
TARTED
This guide outlines the procedure to connect to the Inmarsat network. It will guided you through the
procedure for powering up your terminal, obtaining a GPS position fix, connecting your computer to the
terminal and registering with the BGAN network. You are then ready to start using voice and broadband
services.
S
ETTING
U
P
Y
OUR
T
ERMINAL
Set up the GX-9 terminal as follows.
1.
Verify that the ADU and BDU are
properly connected by the coaxial
cable. And the BDU is connected to a
suitable source of dc power. Refer to
the GX-9 Installation Instructions for
details.
2.
Press the power ON/OFF switch
(located at the left corner of the BDU
front panel). The power LED will
illuminate. The flashing READY LED
indicates that the antenna is
automatically scanning the sky, the
GPS receiver is acquiring a position
fix, and the software is preparing the
terminal for operation. When the
satellite signal has been acquired the
READY LED will change from flashing
to steady on. The terminal is now
ready to operate.
Содержание GX-9
Страница 31: ...Glocom GX 9 FB250 Class Operating Manual 25 ...