Inkema ABRE Скачать руководство пользователя страница 6

       

 

10/03/2010                              Instruction manual ABRE                                        

Pág. 

5

 

Manual ABRE EN V03.doc

 

 
 

           

 

Fig. 4                                                                        Fig. 5 

 
Step 4: Place the  front canvas  in the upper  horizontal guide. Position the rubber that  joins the 
two side canvas. 
 
Use  your  hand  to  apply  pressure  to the  sides  of  the  dock  shelter  and  verify  that  they  contract 
with no trouble at all and the dock shelter operates correctly 
(see Fig. 6). 
 

 

Fig. 6 

 

The installation can be deemed finished when the installer authorised by 

INKEMA 

SISTEMAS, S.L.

 fills in the corresponding installation control sheet. 

  
 
 
 
 
 
 

Содержание ABRE

Страница 1: ...InkemaSistemas S L Instruction manual Retractable Dock Shelter ABRE...

Страница 2: ...03 2010 Instruction manual ABRE P g 1 Manual ABRE EN V03 doc Index Contents Page 01 Index 1 02 Introduction 2 03 Components and parts of the machine 3 04 Assembly 4 05 Instructions for use 6 06 Contac...

Страница 3: ...s it is specific for each machine It is obligatory that you always keep the manual with the dock shelter so you can consult it at any moment should you have any doubts about its use The manufacturer h...

Страница 4: ...30 0007 0322 Rear profile tube 1 1 30 0007 0321 Front profile tube 1 1 30 0008 0018 Hinged support U 4 4 30 0007 0005 Hinged tubes 2 2 30 0012 0163 Bolt 6 3x25 DIN 6928 C 16 16 30 0012 0165 Bolt M8x6...

Страница 5: ...ully parallel Verify that the distance between the sides the width of the dock shelter is correct depending on the width of the dock shelter to install Check that the measurement between the doorway a...

Страница 6: ...r that joins the two side canvas Use your hand to apply pressure to the sides of the dock shelter and verify that they contract with no trouble at all and the dock shelter operates correctly see Fig 6...

Страница 7: ...helter and reverse slowly until you make contact with the rubber stoppers on the facade Fig 7 Fig 8 Correct position Incorrect position Lining up the lorry with the loading platform ensures that the d...

Страница 8: ...doc 06 Contact Inkema Sistemas S L Factory and headquarters C Galileo naves 7 y 8 Apartado de correos 132 08150 Parets del Vall s Barcelona Spain Export Tel 34 93 544 47 08 Fax 34 93 572 30 11 Tel 90...

Отзывы: