
INHECO
07
Doc ID: 900678-001
July 2020
2.2.
Scope of Delivery
Before initial operation, make sure that the shipment of your unit and its scope of supply
is complete and no parts are damaged.
In case of parcel or product damages, make photos of the damaged boxes and products
immediately. Transportation damages
must be reported to INHECO within 7 days of delivery. The following components should
be included in each shipment:
Fig.1: Components
( 1 ) Heated Lid incl. Sub-D-Connector Cable (2)
The Sub-D-Connector Cable is already connected with the Thermoshake and it also
needs to be conntected to the Black Slot Module installed inside the TEC Control Unit
(MTC or STC). → Initial Operation, page 12.
2.3.
Functional Elements
The functional element of the Heated Lid is the temperature controlled contact surface.
The device has to be controlled via a TEC Control Unit ( MTC or a STC).