
INGEREV SMART DLM
Ingeteam
ABW2012IQM01_A
9
EN
ES
FR
IT
4.2.2 A65+
The protective covers protect against direct electrical contact. They should be removed in order to
make the connections and replaced once the connections have been made.
Make the connection as shown in the following figure, installing current transformers in each phase.
Consult the section on
“Current Transformers”
for further information on these
transformers
The wattmeter must be installed upstream from the installation that consumes
and generates the power to be managed.