18-GJ82D1-1F-EN
7
Unit Install Preparation
1.
Check for damage and report promptly to the carrier any damage
found to the unit.
Note:
If the unit must be transported in a horizontal position, it must
be laid on its back (marked “REAR” on carton).
Note:
After unit is removed from the carton, verify coil is pressurized.
Carefully remove the liquid line plug. If no pressure is released,
check for leaks.
Note:
Remove the cardboard from the bottom of the blower. Cut the
tie wrap and remove the foam shipping block located at the
motor.