Ensure the pulley and sheave are properly aligned and the motor
anchor screws are adequately retightened prior to restarting the
compressor.
•
CAUTION
Improper pulley/sheave alignment and belt
tension can result in motor overload, excessive
vibration, and premature belt and/or bearing
failure.
To prevent these problems from occurring,
ensure the pulley and sheave are aligned and belt
tension is satisfactory after installing new belts
or tensioning existing belts.
TANK INSPECTION ________________________________
The life of an air receiver tank is dependent upon several factors
including, but not limited to, operating conditions, ambient
environments, and the level of maintenance. The exact effect of
these factors on tank life is difficult to predict; therefore, Ingersoll
Rand recommends that you schedule a certified tank inspection
within the first five years of compressor service. To arrange a
tank inspection, contact the nearest Ingersoll Rand Customer
Center or distributor, or call 1-800-AIR SERV.
If the tank has not been inspected within the first 10 years of
compressor service, the receiver must be taken out of service
until it has passed inspection. Tanks that fail to meet
requirements must be replaced.
•
WARNING
Failure to replace a rusted air receiver tank could
result in air receiver tank rupture or explosion,
which could cause substantial property damage,
severe personal injury, or death. Never modify or
repair tank. Obtain replacement from service
center.
5
http://air.irco.com
P1.5IU-A9
Содержание P1.5IU-A9
Страница 8: ...PARTS LIST PUMP RECEIVER TANK 8 http air irco com P1 5IU A9 ...
Страница 20: ...PUMP RECEIVER TANK LISTA DE PIEZAS 20 http air irco com P1 5IU A9 ...
Страница 32: ...LISTE DE PIÈCES PUMP RECEIVER TANK 32 http air irco com P1 5IU A9 ...
Страница 36: ...36 http air irco com P1 5IU A9 ...