background image

Page 4 of 16 

CHEMFLO 6 (en)

STORAGE PRECAUTIONS

Do not store filled with fluid at or below freezing temp of 

process fluid.

INSTALLATION

INSTALLATION FOR CHEMFLO END SUCTION 

PUMPS:

MP CHEMFLO centrifugal pumps should be installed with a 

flooded suction as near to the liquid source as possible. A MP 

CHEMFLO is not a self-priming pump. If the liquid source is 

located below the pump a footvalve and some provision for 

priming must be used. The pump housing and suction line 

must be completely filled with liquid before operation.

Piping should include shutoff valves and pipe unions on both 

the discharge and suction to isolate the pump for mainte-

nance.

Provisions for suction and discharge pressure gages are 

recommended  for  troubleshooting.  The  suction  line  should          

be as short as possible, at least as large as the pump suction 

connection, include as few fittings as possible and those 

should have a long radius to keep friction losses at a min-

imum. If a footvalve or strainer is included the FREE AREA 

should be at least three times the area of the pump suction 

connection. The suction piping must be absolutely free of 

leaks.

Both suction and discharge piping should be supported in-

dependently of the pump. never draw or pull pipe into place, 

this may impose a strain that will result in misalignment be-

tween the pump and driver or otherwise adversely affect the 

operation of the pump. After connecting piping to the pump 

rotate the shaft several times to check for rubbing or binding.

INSTALLATION FOR CHEMFLO PUMPAKS:

If it is necessary to install the pump above the level of the 

liquid, a priming line should be connected directly to the 

suction line. A check valve must be used in conjunction with 

a priming line or the priming liquid will merely pass through 

the suction line to the liquid source. The priming of the suc-

tion line evacuates the air in the suction line and pump. This 

series of pumps will not handle air and therefore all air must 

be displaced from the suction line and pump before the 

pump can operate. Be sure that the pump housing is filled 

with liquid before starting the pump. 

THE MECHANICAL 

SEAL IN THE PUMP MUST NOT BE OPERATED DRY.

Pipe or hose of the same size (or larger) as inlet and outlet 

openings should be used on the installation.  When using 

pipe, avoid sharp bends and use long radius elbows wherev-

er possible. This will keep friction loss at a minimum and al-

low the pump to operate more effectively. Use pipe dope on 

all connections and be sure all fittings are airtight, especially 

on the suction side of the pump. An air leak on the suction 

side of the pump will prevent proper operation. A section of 

non-collapsible hose between piping and pump may be used 

as a vibration dampener.

BEARING INSTALLATION (PEDESTAL MODELS):

Check the shaft to insure that it rotates freely. Shafts should 

be aligned in accordance with the instructions of the cou-

pling manufacturer. Final alignment must be performed after 

the pump has been completely installed and the pump and 

driver are at operating temperature. Proper shaft alignment is 

the responsibility of the installer.
The MP CHEMFLO centrifugal pump should be installed with 

a flooded suction as near to the liquid source as possible.  

CHEMFLO pumps are not self-priming pumps. If the liquid 

source is located below the pump a footvalve and some

provision for priming must be used. The pump housing and 

suction line must be fully primed before operation. The me-

chanical seal in the pump must not be operated dry.

Piping should include shutoff valves on both the discharge 

and suction to isolate the pump for maintenance. Provisions 

for suction and discharge pressure gages are recommended 

for trouble shooting. The suction line should be as short as 

possible, at least as large as the pump suction connection, 

include as few fittings as possible and those should be long 

radius to keep friction losses at a minimum. If a footvalve 

or strainer is included the free area should be at least three 

times the area of the pump suction connection. The suction 

piping must be absolutely free of leaks.

Both suction and discharge piping should be supported in-

dependently of the pump. Never use excessive force to move 

the pipe into place. This may impose a strain that will result 

in misalignment between the pump and driver or otherwise 

adversely affect the operation of the pump. After connecting 

pipe to the pump rotate the shaft several times to check for 

rubbing or binding.

RELEASED 03/Sep/2021 12:38:55 GMT

Содержание MP PUMPS CHEMFLO 6

Страница 1: ...the operator Keep for future reference OPERATOR S MANUAL CHEMFLO 6 INCLUDING OPERATION INSTALLATION AND MAINTENANCE RELEASED 8 27 21 REV A CHEMFLO 6 3 X 2 INGERSOLL RAND COMPANY INC 34800 BENNETT DR...

Страница 2: ...nstruction 316 stainless steel Flow CC Up to 450 gpm 1703 lpm Hydraulic Up to 500 gpm 1893 lpm Pedestal Up to 450 gpm 1703 lpm Head Feet CC Up to 157 ft 49m Hydraulic Up to 190 ft 58 m Pedestal Up to...

Страница 3: ...als elastomers and all wetted parts to assure compatibility before using commission of the product y Verify the chemical compatibility of the pump wetted parts and the substance being pumped flushed o...

Страница 4: ...NOT BE OPERATED DRY Pipe or hose of the same size or larger as inlet and outlet openings should be used on the installation When using pipe avoid sharp bends and use long radius elbows wherev er poss...

Страница 5: ...en tighten the drive clamp assembly to lock the shaft sleeve onto the driver shaft After all fasteners are tight including the drive clamp assem bly remove the Assembly shim from the suction connectio...

Страница 6: ...otors called impellers The action of the impeller increases the fluid s velocity and pressure and directs it towards the pump outlet WEAR AND INSPECTION POINTS Shaft Inspect threads keyways and should...

Страница 7: ...surface of the seal seat in the adaptor Slide impeller and seal assembly into the adaptor Install drive clamp assembly on the shaft sleeve but do not tighten INSTRUCTIONS FOR SET SCREW TYPE SEAL Do no...

Страница 8: ...3 8 16 x 1 63 4 21261 304 SS Cap Screw HH 5 16 18 x 7 8 4 21242 304 SS Capscrew HH 3 8 16 x 2 25 4 21269 304 SS Stud 3 8 16x2 00 4 33161 304 SS Capscrew ZPS HH 1 4 14 x 0 63 self DrillTap 4 36711 STEE...

Страница 9: ...1 29992 CAST IRON Hydraulic Motor 1 59 DISP 1 29993 CAST IRON 12 Lockwasher 1 2 2 21254 304 SS 13 Capscrew HH 1 2 13 x 1 25 2 21246 304 SS 14 Pipe Plug 1 8 NPT 2 21255 316 SS Pipe Plug 1 4 NPT 2 2126...

Страница 10: ...233 VITON O Ring AS 568 163 1 33757 EPDM O Ring AS 568 164 1 31234 TEFLON EN CAPS SIL 7 Housing Seal 1 31093 CF8M SS Housing Seal 1 32017 CF8M SS Item Description size Qty Part No Mtl 8 Slinger 1 3788...

Страница 11: ...SS PED 5 6T 2100 N A MP51282 MP31751 MP38388 CF6PMP SS PED 5 6T 9 N A MP51282 MP31751 MP35686 CF6PMP SS PED 5 93T 21 CCS N A MP51282 MP31750 MP38502 CF6PMP SS PED 5 93T 2100 N A MP51282 MP31750 MP3987...

Страница 12: ...Page 12 of 16 CHEMFLO 6 en DIMENSIONAL DATA CF6 PUMPAK FOR 145TC Figure 7 CF6 PUMPAK FOR 184TC Figure 8 RELEASED 03 Sep 2021 12 38 55 GMT...

Страница 13: ...CHEMFLO 6 en Page 13 of 16 DIMENSIONAL DATA CF6 PUMPAK FOR 215TC Figure 9 CF6 W 1 16 DISP HYDRAULIC MOTOR Figure 10 RELEASED 03 Sep 2021 12 38 55 GMT...

Страница 14: ...Page 14 of 16 CHEMFLO 6 en DIMENSIONAL DATA CF6 W 1 16 DISP HYDRAULIC MOTOR Figure 11 CF6 PED Figure 12 RELEASED 03 Sep 2021 12 38 55 GMT...

Страница 15: ...there are no obstructions in the suc tion line Check NPSHa to ensure that there is enough liquid for pump oper ation 6 Driver is not operating at rated speed 6 Check electric motor voltage check engin...

Страница 16: ...driver with pump 7 Power frame shaft is bent 7 Repalace shaft 8 Worn suction side plate or wear rings 8 Replace defective parts as required 9 Liquid heavier than expected 9 Check specific gravity and...

Отзывы: