Installation / Assembly
T-Rack
®
3.0 Series
– Assembly Instructions 1.1(2019-03) E inge
Page 50 of 84
© inge GmbH
5.8
Mounting Module 2
NOTE
CAUTION, PROPERTY DAMAGE!
Danger of damage to the system and leaks if the top T pieces are
connected before the bottom T pieces.
Always first connect the bottom and then the top T pieces!
Step
Activity
Figure
1
Mount module 2
Number of persons: 4
a)
Continue holding module 1 in position to prevent tipping.
b)
Mount module 2 using the procedure described in section:
back
front
= actual
1
2