75
Power on Procedure
Before you power on the system, please power on the expansion enclosure first if
your network configuration has multiple arrays.
To power on the system please follow the procedures below.
1. Turn on the power
switches to the “on” position for every PSU (shown in
blue
).
2. Power on the networking devices, e.g. switches.
3. Power on the host computers. They should be the last devices to be turned on.
2U models (3008 model)
2U models (3012 model)
3U models
NOTE
Make sure all power supply modules
’ switches are turned on!