Infineon MicroIAS Скачать руководство пользователя страница 3

 

 

 

3 of 5 

  

 

 

V1.5 

Infineon Alarm System – Quick Start Guide 

2

 

Start up procedure 

2.1

 

Connecting the MicroIAS 

The purpose of the MicroIAS is that of a reference design that can be quickly built into an end application for 
initial evaluation purposes. This board has a minimal number of test points and connections allowing the user 
to wire this board directly into the end application for test purposes. 
 
The  board  comes  pre-loaded  with  a  bootloader  tailored  to  using  the  board  for  glass-break  and  intruder 
functionality.  
 
The board also has been outfitted with all the needed connections (Figure 2) to power and re-program/debug 
the board as well as adjust sensitivity settings, if so desired. Refer to the more comprehensive 

MicroIAS User Guide

 

for more details on how to re-program, debug and adjust sensitivity settings. 
 
To evaluate the board as is, no connections to CON1 need to be made (the included 10-pin ribbon cable is meant 
for re-programming and/or debugging with a J-LINK debugger or similar MCU programming tool), follow these 
few simple steps to setup your form-factor MicroIAS board: 
 

 

Connect an external 5V power supply to CON2 via the matching black/red wire pair with receptacle (included 
in the MicroIAS evaluation kit package). A battery pack, lab power supply or power bank producing a clean 5V 
output voltage will suffice. Connect the red wire to 5V (do not exceed 6V, as >6V power supplies may damage 
the on-board LDO used to generate the 1.8V for the sensors and the MCU) and the black wire to the ground of 
your power source. 
 

 

Onced  powered  up,  LED1  (green),  located  between  the  pressure  sensor  and  the  LDO  should  be  lit,  and 
indicating that power to the system has been applied. The on-board LDO converts 5V to the required 1.8V for 
sensors, MCU and flash memory. 

 

 

After powering up the MicroIAS, a board reset must be issued. To accomplish that, press SW1 (located below 
the 2x5 Hirose connector CON1) once. It is recommended to use a pointed object for pressing the small form-
factor toggle switch. The red LED to the right of SW1 will light up once within 5s to 6s of releasing the toggle 
switch SW1. 

 

 

By default, the MicroIAS code is set to recognize both glass break (simulated sound via e.g. Vitron and real) 
and intruder events. 
 

o

 

Intruder – Pressure change in the room will produce one slow blink of the red LED (LED2) located 
right below the 2x5 header (CON1). 

o

 

Glassbreak – Glass break sound + instantaneous pressure change in the room will produce  
rapid blinks
 of LED2 

 

 

 

Содержание MicroIAS

Страница 1: ...t Guide About this document Scope and purpose The document is the Quick Start Guide for Infineon s Micro IAS It contains information pertaining to the setup and usage of the MicroIAS Intended audience Customers interested in evaluating the MicroIAS Table of Contents About this document 1 Table of Contents 1 1 MicroIAS 2 2 Start up procedure 3 2 1 Connecting the MicroIAS 3 Revision history 4 ...

Страница 2: ...re developer access to all essential interfaces such as UART SWD CON1 connector for development and debug power supply a manual reset SW1 and it provides visual aids LED1 and LED2 for the user to identify power applied LED1 green and alarm triggered LED2 red blinks once for intruder an twice for glass break An external power supply with a 3 6V to 6V range must be applied between GND and VCC on CON...

Страница 3: ...via the matching black red wire pair with receptacle included in the MicroIAS evaluation kit package A battery pack lab power supply or power bank producing a clean 5V output voltage will suffice Connect the red wire to 5V do not exceed 6V as 6V power supplies may damage the on board LDO used to generate the 1 8V for the sensors and the MCU and the black wire to the ground of your power source Onc...

Страница 4: ...19 Updated connectivity text section to ensure IO19 and IO20 are shunted correctly for proper functionality 1 2 2 27 2020 Updated pin labeling in Figure 2 1 3 3 2 2020 Added reset procedure after power up in Section 2 1 4 9 15 2020 Restructuring of figures to reflect latest updates of layout and connectivity updates to start up procedure section in this document 1 5 11 28 2020 Updated connectivity...

Страница 5: ...s in customer s applications The data contained in this document is exclusively intended for technically trained staff It is the responsibility of customer s technical departments to evaluate the suitability of the product for the intended application and the completeness of the product information given in this document with respect to such application For further information on the product techn...

Отзывы: