6 - 9
IP
N 07
4-
51
1-
P1
C
SQM-160 Operating Manual
6.3.1 Front Load
Follow the procedure below to replace the crystal in the Front Load sensor: (see
)
1
Gripping the crystal holder with your fingers, pull it straight out of the sensor
body.
2
Gently pry the crystal retainer from the holder (or use the Crystal Snatcher; see
3
Turn the crystal holder over and the crystal will drop out.
4
Install a new crystal, with the patterned electrode face up.
5
Push the retainer back into the crystal holder and replace the crystal holder in
the sensor body.
Figure 6-1 Front Load Crystal Sensor (Exploded)
Front Load Crystal Holder
(IPN 750-172-G1)
Front Load Standard
Crystal Sensor Body
(IPN 750-207-G1)
Crystal (IPN 008-010-G10)
Fully Coated Face (Gold)
Finger Spring Contact
(IPN 750-171-P1)
Crystal Retainer
(IPN 007-023)
In-Vacuum Cable
To XIU
Water Tubes
Содержание SQM-160
Страница 1: ...O P E R A T I N G M A N U A L SQM 1 60 Multi Film Rate Thickness Monitor IPN 074 511 P1C ...
Страница 2: ......
Страница 5: ......
Страница 6: ......
Страница 8: ......
Страница 22: ...1 10 IPN 074 511 P1C SQM 160 Operating Manual This page is intentionally blank ...
Страница 30: ...2 8 IPN 074 511 P1C SQM 160 Operating Manual This page is intentionally blank ...
Страница 60: ...4 12 IPN 074 511 P1C SQM 160 Operating Manual This page is intentionally blank ...
Страница 76: ...5 16 IPN 074 511 P1C SQM 160 Operating Manual This page is intentionally blank ...
Страница 98: ...6 22 IPN 074 511 P1C SQM 160 Operating Manual This page is intentionally blank ...
Страница 110: ...8 8 IPN 074 511 P1C SQM 160 Operating Manual This page is intentionally blank ...
Страница 120: ...A 10 IPN 074 511 P1C SQM 160 Operating Manual This page is intentionally blank ...