Inficon CP300C9 Скачать руководство пользователя страница 8

 

8

 

 

IG9972BEN     (2017-09)     Plug-In Boards.om

 

 

4 Installation 

 

  Use screened cables only (connect screen to barrel of connector). If both 

ends of the screen are connected to ground, compensating currents must 
be prevented (e.g. by connecting all involved units to a common power 
distributor). 

In a Profibus-DP installation (IF300P board), use the recommended special 
cable only (

 

 [2]). 

 
 

 

  For safety reasons, vacant slots should always be covered with blank 

panels. 

Disconnect all cables from the unit before installing / removing any plug-
in modules. 

 

 

Modules should only be handled on an ESD protected bench. 

 
 

 

  Switch off the unit and wait one minute 

  Remove all cables (power cable last) 

  Unscrew the blind plate / plug-in module 

  Insert / remove plug-in module 

  Screw on the plug-in module / blind plate 

  Connect the cables (mains cable first) 

  Switch on the unit again 

 

 

To ensure correct operation, check that the screws of the plug-in 
modules are tightened. 

 
 

 

  Additional protective measures must be taken if certain processes in the 

vacuum system (e.g. flashovers) can cause hazardous voltages on the 
gauge terminals. 

 

  Although the gauge cables are screened, they should not be routed in 

parallel to lines producing strong electrical noise. 

 

Connect the gauge to the <TPR> connector on the rear panel. The connectors are 
locked so that they cannot be separated accidentally. 
 
 

General 

4.1  Installing / Removing 

the Plug-In Boards 

Procedure 

4.2  Connecting the Pirani 

Gauge 

Содержание CP300C9

Страница 1: ...Operating M IG9972BEN 20 Plug Contr CP300C IF300P Manual 017 09 In Bo roller C9 oards TPG3 for T 300 otal P Pressure G Gauge e 1...

Страница 2: ...s a supplement to the documentation of the basic unit TPG300 1 This document applies to plug in boards listed below Type Description Part number CP300C9 Pirani cold cathode measurement board IO441000...

Страница 3: ...nstalling Removing the Plug In Boards 8 4 2 Connecting the Pirani Gauge 8 4 3 Connecting the Cold Cathode Gauge 9 4 4 Connecting the OUTPUT Analog Signal 10 4 5 Connecting the Relays of the IF300P 10...

Страница 4: ...st effective use Skilled Personnel This work may only be carried out by persons with suitable technical training and the necessary experience Waiting time reaction time duration of test Marking See pa...

Страница 5: ...nductivity of gases is a function of the pressure Pirani thermal conductivity vacuum gauges exploit this phenomenon for pressure measurements The measurement element consists of a thin filament with a...

Страница 6: ...supply cold cathode gauges Operating voltage Measurement current kV A 3 3 600 Signal output Measured value analog Error message Current max Output resistance V V mA 0 10 11 5 2 400 Reaction time 10 90...

Страница 7: ...are inadmissible for safety reasons 0 6 A at 50 V dc 0 8 A at 40 V dc 1 5 A at 30 V dc Connection equipment side Type D sub connector 15 pin male Transition resistance with socket 125 m Interface Typ...

Страница 8: ...t one minute Remove all cables power cable last Unscrew the blind plate plug in module Insert remove plug in module Screw on the plug in module blind plate Connect the cables mains cable first Switch...

Страница 9: ...m indicates the conditions under which a triaxial cable is required The maximum length of 100 m for coaxial cables is specified by EN 61010 Greater lengths are not admissible without additional protec...

Страница 10: ...ement board The relay connector on the rear of the IF300P has the following pin assignment IF 300P 1 9 15 8 Pin location Relay 3 Switching function 3 Relay 2 Switching function 2 Relay 1 Switching fun...

Страница 11: ...e connector on the rear of the IF300P has the following pin assign ment DGND VP Only necessary a bus end devices RxD TxD P B wire CNTR P optional Screen 8 9 6 7 4 5 2 3 1 Pin Do not connect RxD TxD N...

Страница 12: ...should only be performed after the equipment has attained operating temperature 10 minutes With gauge connected lower the vacuum chamber pressure to 1 10 4 hPa Select the measurement circuit to be ad...

Страница 13: ...Clean or replace gauge 3 Problem Possible cause Correction Cold cathode constantly indicates overrange even though Short circuit in the cold cathode cable gauge Replace or repair the cable gauge the...

Страница 14: ...te to 19200 Baud Incorrect data format Adhere to the standardized Profibus DP data format 2 Cycle time 100 ms Incorrect firmware Firmware TPG300 302 654 Firmware Profibus V1 5 Incorrect Baud rate 1 Se...

Страница 15: ...ITC548456 ITC448047 15 ITC548457 ITC448043 20 ITC548458 ITC448044 25 ITC548459 ITC120025 30 ITC548460 ITC120030 35 ITC548461 ITC120035 40 ITC548462 ITC120040 45 ITC548463 ITC120045 50 ITC548464 ITC12...

Страница 16: ...ITC230010 15 ITC220015 ITC230015 20 ITC220020 ITC230020 25 ITC220025 ITC230025 30 ITC220030 ITC230030 35 ITC220035 ITC230035 40 ITC220040 ITC230040 45 ITC220045 ITC230045 50 ITC220050 ITC230050 Conne...

Страница 17: ...IG9972BEN 2017 09 Plug In Boards om 17 Appendix A Output Signals of the Measurement Boards Pirani Gauge TPR018 with CP300C9...

Страница 18: ...18 IG9972BEN 2017 09 Plug In Boards om Cold Cathode Gauge IKR085 with CP300C9...

Страница 19: ...IG9972BEN 2017 09 Plug In Boards om 19 Indicated pressure instrument calibrated for air B Gas Type Dependence Pirani Gauge TPR018...

Страница 20: ...017 09 Plug In Boards om Indicated pressure Instrument calibrated for air Mean values deviations possible depending on degree of contamination Reference gauge Hot cathode ionization gauge Cold Cathode...

Страница 21: ...in 2 www inficon com Communication Protocol Profibus DP Interface Board IF300P IG9973BEN INFICON AG LI 9496 Balzers Liechtenstein 3 www inficon com Operating Manual Pirani Gauge TPR018 BG9976BEN INFIC...

Страница 22: ...LI 9496 Balzers Liechtenstein Tel 423 388 3111 Fax 423 388 3700 Original English reachus inficon com www inficon com i g9972ben...

Отзывы: