background image

 

®   

2011                                    - 4 -        For the SOP number see section 15 PRO1 V11.xxx

 

Exclusion of liability 

We have checked the contents of this manual and every effort has been made to ensure that the 
descriptions  are  as  accurate  as  possible.  However,  deviations  from  the  description  cannot  be 
completely  ruled  out,  so  that  no  liability  can  be  accepted  for  any  errors  or  omissions  in  the 
information given. The data in this manual are checked regularly and the necessary corrections will 
be included in subsequent editions. If you have any suggestions, please do not hesitate to contact 
us.   
 

Subject to technical modifications without notice.

 

 
 

Copyright 

Copyright Inepro Metering June    2011. All rights Reserved. 
It is prohibited to pass on or copy this document or to use or disclose its contents without express 
permission of Inepro Metering BV. Any duplication is a violation of the law and subject to criminal 
and  civil  penalties.  All  rights  reserved,  particularly  for  pending  or  approved  patent  awards  or 
registered trademarks. 
 
 

Registered trademarks 

DMMetering

®

 is a registered trademark of Inepro Metering BV – member of the Inepro Group. 

Other names appearing in this manual may be trademarks of third parties and are property of their 
respectful owners. 
 

2

 

Foreword 

 
Thank you for purchasing this energy meter. Inepro has a wide product range of devices. We have 
introduced a large number of energy meters on the market suitable for 110V AC to 400V AC (50 or 
60Hz). Besides the normal energy meters we also developed our own pre-paid meters with chip 
card, chip card re-loaders and a complete PC management control system. For more information 
on other products please contact our sales department at [email protected] or visit our 
website at www.ineprometering.com. 
 
Although we produce this device according to international standards and our quality inspection is 
very accurate it’s still possible that this device shows a defect or failure for which we do apologize. 
Under normal conditions your product should give you years of trouble free operation. In case 
there is a problem with the energy meter you should contact your distributor immediately. Most of 
our energy meters are sealed with a special seal. Once this seal is broken there is no possibility to 
claim any warranty. Therefore NEVER open an energy meter or break the seal of the device. The 
warranty period is 3 years after production, and only valid for production faults. 

Содержание DMMetering PRO1 V11 Series

Страница 1: ...meter PRO1D V11 111 PRO1D V11 112 PRO1D V11 121 PRO1D V11 122 PRO1D V11 211 PRO1D V11 212 PRO1D V11 221 PRO1D V11 222 Version 1 12 Note the picture on the frontpage is a meter from the series of this...

Страница 2: ...e number table 8 6 Performance criteria 8 7 Specifications 8 8 Basic errors 9 9 Description 9 10 Dimensions 9 11 Installation 10 12 Operation 11 12 1 Consumption indication 11 12 2 Reading the meter 1...

Страница 3: ...ommended and approved by Inepro Metering B V Proper handling The prerequisites for perfect reliable operation of the product are proper transport storage installation and connection as well as proper...

Страница 4: ...p Other names appearing in this manual may be trademarks of third parties and are property of their respectful owners 2 Foreword Thank you for purchasing this energy meter Inepro has a wide product ra...

Страница 5: ...2011 5 For the SOP number see section 15 PRO1 V11 xxx 3 MID certificate...

Страница 6: ...2011 6 For the SOP number see section 15 PRO1 V11 xxx 4 CE certificates...

Страница 7: ...2011 7 For the SOP number see section 15 PRO1 V11 xxx...

Страница 8: ...y class 1 Protection against penetration of dust and water IP51 Insulating encased meter of protective class II 7 Specifications Meter type PRO1D PRO1TE series Nominal voltage Un 230V AC Operational v...

Страница 9: ...8C 1 0 9 Description A Display register B Terminal block C Case D Protection cover E Security wire slot Material Register PC flame resistant plastic Case ABS flame resistant plastic Terminal block AB...

Страница 10: ...eaker should comply with the specifications of the building s electrical design and all local regulations An external fuse or thermal cut off used as an overcurrent protection device for the meter mus...

Страница 11: ...her a digital or mechanical register See the version numbering in section 1 3 12 3 Mechanical register The PRO1TE series energy meter is equipped with a mechanical 5 1 register which is used to record...

Страница 12: ...source for correct operation For this external voltage source the voltage Ui should be lower than 27V DC The maximum switching current Imax is 27mA To connect the impulse output connect 5 27V DC to co...

Страница 13: ...personnel familiar with applicable codes and regulations Use insulated tools to maintain or repair the meter Make sure the protection cover is in place after maintenance or repair The case is sealed...

Страница 14: ...on for the manufacturer In case you need his support you might be asked to give the SOP number referring to the type of meter you bought Problem Possible cause Check solution No pulse output The pulse...

Страница 15: ...2011 15 For the SOP number see section 15 PRO1 V11 xxx This page is left blank on purpose...

Страница 16: ...2011 16 For the SOP number see section 15 PRO1 V11 xxx This page is left blank on purpose...

Отзывы: