Mounting and commissioning
6.1
Safety advices for mounting
Danger!
Only experts may work at the electrical equipment.
Danger!
Observe the mains supply to requirements of the local electricty sup-
ply company, the VDE and the local electricity company.
Use always the 2-pin power plug with safety contacts for connecting
the system to the mains supply. Improper connection can result in
injury and damage to the system.
Danger!
Check before connecting the system, whether the existing mains
voltage corresponds with the operating voltage of the system. If the
voltages do not match, the system can be damaged.
6.2
Mounting process
Place the system on a clean and dry table horizontal. The ground
must be firm and level. Around the machine the following work area
must be kept free: left and right 0.5 m. Behind the machine 0.5 m. Be-
fore the installation at least 1.5 m of free workspace.
Cooling air may not exceed 35 °C (95 °F) and should be free of con-
taminations.
Establish supply connections according to the information in chapter
3
current,
protective gas,
cooling water and
vacuum.
Examine supply lines and connections for damages.
Only after the correct connection of all supply and connecting sys-
tems, the system may be put into operation.