24
Hood Assembly - Continued
STEP 1 - Support Air Cleaner/Frame assembly from floor or ceiling according to local building code.
STEP 2 - Once unit is securely mounted, loosely attach hood pieces to main frame using the
provided 1/4 x 1 self threading bolts. Start with the corners first, then add the side and end pieces.
STEP3 - Loosely connect hood pieces to each other with provided 1/4 x 1 bolts, nuts, flat washers &
lock washers. Start at one corner and work your way around the entire hood.
STEP 3 - Make sure Pieces are Level then Tighten all bolts. Tighten the self threading bolts first
then the hood pieces together.
STEP 4 - Fasten curtain to bottom of hood using #8 x 3/4 tek screws. If curtain option selected.
Again starting at one corner and work your way around.
STEP 6 - Attach light fixtures to underside of air cleaner using #8 x 3/4 tek screws. Make sure to
mount in a location that does not prohibit removal of the mesh prefilters. That is your main access for
switching filters. Wiring and conduit by others.
STEP 7 - Electrical installation by qualified electrician according to NEC and local building code.