manualshive.com logo in svg
background image

 

PN: 114-0002 
Revision 3.0 

Models beginning with

 

 

 

Integrated Metering Systems, Inc. 

eginning with MS120S01, ES120S01, MD240S01

 Single Meter Outdoor Units

Product Description

Technical Specifications

Installation 

 

 

 

 

Integrated Metering Systems, Inc.  

MD240S01, & ED240S01 

Outdoor Units

 

 

Product Description 

Specifications 

Installation Instructions 

 

Shop for Power Metering products online at:

1.877.766.5412

www.

PowerMeterStore

.com

Содержание ED240S01

Страница 1: ...20S01 MD240S01 Single Meter Outdoor Units Product Description Technical Specifications Installation Integrated Metering Systems Inc MD240S01 ED240S01 Outdoor Units Product Description Specifications Installation Instructions Shop for Power Metering products online at 1 877 766 5412 www PowerMeterStore com ...

Страница 2: ...ical Specifications 8 2 3 Input Output Connections and User Display 9 3 Installation Instructions 11 3 1 Explanation of Warning Symbols 11 3 2 Safety Precautions 11 3 3 Preparation 12 3 4 List of Materials 12 3 5 Mounting the Enclosure 12 3 5 1 Mounting Location 12 3 5 2 Drilling Conduit Holes 13 3 5 3 Mounting Procedure and Conduit Installation 13 3 6 Installation of Voltage Lines 14 3 7 Variatio...

Страница 3: ...odel number format 6 Figure 4 New enclosure model number format 7 Figure 5 Mini Meter connections and display 9 Figure 6 Mounting the enclosure 13 Figure 7 IMS solid core CTs 15 Figure 8 IMS split core CTs 15 Figure 9 Mini Meter or EE Module hookup diagram 17 List of Tables Table 1 Electrical and environmental specifications 8 Table 2 I O connections 10 Table 3 Display indicators 10 Shop for Power...

Страница 4: ...th a single meter Encapsulated model for harsh environments model number prefixes EE AMR compatible isolated pulse outputs Reverse phase LED indicator 10 year warranty 1 3 Meter Certifications UL Listed 100A 200A models only for use in the US or Canada Conforms to accuracy requirements set forth in ANSI C12 1 Certified to California Division of Measurement Standards Approved by the California Ener...

Страница 5: ...ns 1 4 2 Enclosures Mini Meter and EE Module small enclosures are manufactured by Bud Industries Inc www budind com The outline and mounting drawing for the small enclosure is shown below in Figure 2 More detailed specification sheets are available from the Bud website part number NBB 15240 Shop for Power Metering products online at 1 877 766 5412 www PowerMeterStore com ...

Страница 6: ...tems Inc 5 1 5 Product Description Figure 2 Small enclosure outline and mounting dimensions 1 5 Applications Apartments Marinas Mobile Home Parks Campgrounds Anywhere accurate electric submetering is needed Shop for Power Metering products online at 1 877 766 5412 www PowerMeterStore com ...

Страница 7: ... 1 MM indicates a Mini Meter Product EE denotes epoxy encapsulated versions 2 Meter configuration S Single Element Meter D Dual Element Meter 3 Rated Voltage L1 or L2 to Neutral 4 CT Ratio 1001 100 0 1 2001 200 0 1 2002 200 0 2 4001 400 0 1 5 Outputs T Provided with 0 1 kWh and 0 01 kWh isolated outputs and 0 1 kWh counter output Blank Provided with 1 0 kWh 0 1 kWh and 0 01 kWh isolated outputs an...

Страница 8: ...lement EE module 1 phase 2 wire ED Dual Element EE module 1 or 2 phase 3 wire 2 Voltage 120 120V 1 phase 2 wire Single Element only 240 240V 1 or 2 phase 3 wire Works with 208V applications as well For Single Element Models MS and ES 1PH 2W Voltage rating is Phase to Neutral For Dual Element Models MD and ED 1PH 3W 2PH 3W Voltage rating is Phase to Phase 3 Enclosure Size S Small outdoor enclosure ...

Страница 9: ...ency 50 60 Hz Power Factor Range 0 5 to 1 0 leading or lagging Accuracy 0 5 of registration 1 0pf 2 to 200 A 0 75 of registration 0 5pf 2 to 200 A Operating Temperature Range 30 to 60 degrees C Rated Pollution Degree2 2 Rated Relative Humidity 80 Terminal Blocks Dinkle International Connector EK508 11P or equiv 4 4 in lb of torque maximum Table 1 Electrical and environmental specifications 1 Produ...

Страница 10: ... with respect to neutral N White wire Neutral input L2 Red wire voltage input Line 2 120V with respect to neutral MMD and EED models only CT Inputs CT1 X1 Current Transformer input CT1 Colored wire of CT1 CT1 X2 Current Transformer input CT1 White wire of CT1 CT2 X1 Current Transformer input CT2 Colored wire of CT2 MMD and EED models only CT2 X2 Current Transformer input CT2 White wire of CT2 MMD ...

Страница 11: ...h 100 or kh 1000 For 12 VDC electro mechanical counter 12 VDC MMS and MMD models only 12 VDC output current rating is 3 mA max Table 2 I O connections Recommend IMS counter 521 001 1 kWh models 512 002 0 1 kWh models or equivalents LED Indicators Description Power LED green Illuminates when the meter is supplied with proper voltage Load LED green 50 duty cycle at constant load LED to verify proper...

Страница 12: ...rds Prior to proceeding de energize the circuit and consult the operation manual Indicates that the equipment is protected throughout by double insulation 3 2 Safety Precautions WARNING Installation of electric meters requires working with possibly hazardous voltages These instructions are meant to be a supplement to aid trained qualified professionals Turn off all power supplying the equipment be...

Страница 13: ...ctions 3 4 List of Materials Mini Meter or EE Module small enclosure and associated mounting materials Line 1 Line 2 and Neutral hook up wires as needed for the electrical service Wires must be 18 AWG or larger and insulated for 300 VAC min Current Transformers CTs This product is designed for use with IMS CTs see Section 2 2 for details Flexible non metallic conduit and fittings UL Type 4X for ou...

Страница 14: ...ll voltage and CT wiring 4 7 18 AWG min wires insulated for 300 V min Care should be exercised to keep drill bit away from components inside the enclosure Type 4X conduit and fittings must be used in order to maintain the outdoor rating of the enclosure 3 5 3 Mounting Procedure and Conduit Installation 1 Attach the mounting brackets to the back of the enclosure with the four provided screws as sho...

Страница 15: ...ned so that they are held snuggly in place but do not to over tighten as this may compress and weaken the conductor 3 7 Variations and Installation of Current Transformers To reduce risk of electric shock always open or disconnect the circuit from the power distribution system of a building before installing or servicing current transformers In accordance with NEC CTs may not be installed in any p...

Страница 16: ...gh the conduit if not already done 2 Trim the wire to the appropriate length to avoid coils of excess wiring 3 At MMU strip insulation from wires to approximately 300 inches 4 Connect CT leads to the appropriate meter as described above 5 With power turned off disconnect each monitored conductor and slide on a CT ensuring the CT is correctly oriented as noted above 6 Reconnect the conductors IMS s...

Страница 17: ...Strip wiring to approximately 300 inches 4 Connect the CT leads to the appropriate meter as described above 5 With power to the conductors turned off place one CT around each conductor ensuring that the white dot is facing the line side Failure to install CTs in the correct orientation and on the correct phase will lead to inaccurate meter readings Figure 9 shows a wiring diagram for Mini Meters a...

Страница 18: ...ER OR EE MODULE OUTDOOR INSTALLATION GUIDE Integrated Metering Systems Inc 17 Hookup Diagrams Figure 9 Mini Meter or EE Module hookup diagram Shop for Power Metering products online at 1 877 766 5412 www PowerMeterStore com ...

Страница 19: ...inated power down the voltage supply and verify that CTs are installed correctly Load LED The load LED is described in section 2 3 This LED should be cycling at 50 duty cycle when the meter is connected properly and a constant load is applied 3 9 Securing the Enclosure In accordance with safety requirements enclosures must be secured using the provided key lock once installation is complete The pu...

Страница 20: ...ne CT installed in the incorrect direction doesn t always illuminate the reverse phase LED Make sure that current and voltage connections are in phase see Sections 3 6 and 3 7 Check power connections and fuses 4 Counter isn t incrementing Verify the Load LED is working On Mini Meters verify that counter wires are connected to COUNTER terminals FAQ Q Can you use additional sets of current transform...

Страница 21: ...r enclosures provide a loop for padlocks or other tamper evident equipment The displays are all non resettable Q Can voltage input wires and current transformer secondary leads be routed through the same conduit A Yes provided you are using IMS supplied CTs Alternate CTs must have a 0 1 A max secondary rating and 18 AWG min wires with at least 300 VAC insulation rating Q Can digital output wires b...

Страница 22: ...IMS is not responsible for uninsured packages or packages lost by your carrier Integrated Metering Systems IMS 11701 S Belcher Rd Suite 123 Largo FL 33773 All returns are subject to a handling restocking charge except for product shipped in error or products under warranty All charges modification repair restock etc related to returned products will be determined by IMS upon evaluation All shippin...

Страница 23: ...enclosure model numbers Changes Figure Table linking Removed transmitter installation Added section 3 9 Securing the Enclosure Changed NEMA to UL Type Removed IMS CT open circuit protection wording Removed reference to metallic conduit 2 5 18 May 2009 Stylistic Changes Added double insulation symbol and RMA page 3 0 22 May 2009 Final Review Changes and Production Release Shop for Power Metering pr...

Отзывы: