© Copyright 2011 IMS Company. All rights reserved.
An ISO 9001:2008 Registered Quality Company
6
9. Select required height for second Shelf –
repeat step 8 to assemble (
image K
)
10. Position Top Frame Assembly at top of frame using
¼''-20 x
3
/
4
'' Hex Head Bolt, ¼'' Flat Washer, ¼'' Locking
Washer, & ¼'' -20 Hex Nut (
images L & M
).
M
L
K