STEP 2 (See Diagram 2)
A.) Insert the Axle (# 4) into the Pivot on the Main Frame (#1). Attach the Left and Right
Handlebars (#2) & (#32) onto the Axle from both sides. Secure the Axle with two
7/8”
Washers (#7) and M8 Nylon Nuts (#8). Close both ends with two Axle End Caps (#9).
B.) Insert the Lower Handlebar (#3) into the Left Handlebar (#2). Secure it with two M6 x 5/8”
Allen Bolts (#6) and
½” Flat Washers (#5). Repeat same procedure to install the other side.
DIAGRAM 2
5
Содержание MARCY MCPL-105
Страница 4: ...3...
Страница 9: ...EXPLODED DIAGRAM 8...