STEP 2 (See Diagram 2)
A.) Connect the Main Base Frame (#1) to both the Front & Rear Stabilizers (#5 & 4). Secure each end
with two M10 x 2 ¾” Carriage Bolts (#109), one 4 ¾” x 2” Bracket (#44), two
∅
¾” Washers
(#124), and two M10 Aircraft Nuts (#128). DO NOT tighten all the nuts and bolts yet.
B.) Attach the Rear & Front Vertical Beams (#6 & 7) to the Main Base Frame (#1). Secure each Beam
with two M10 x 2 ¾” Carriage Bolts (#109),
∅
¾” Washers (#124), and M10 Aircraft Nuts (#128).
C.) Place the Upper Frame (#8) onto the Front & Rear Vertical Beams. Secure the Upper Frame to
Rear Vertical Frame with two M10 x 2 ¾” Carriage Bolts (#109),
∅
¾” Washers (#124), and M10
Aircraft Nuts (#128).
D.) Secure the Upper Frame to the Front Vertical Beam with two M10 x 3 ½” Carriage Bolts (#108),
one 6 ¼” x 2” Bracket (#43), two
∅
¾” Washers (#124), and two M10 Aircraft Nuts (#128).
E.) Attach the Lat Bar Holder (#31) to the front of the Upper Frame (#8). Secure it with one M10 x 2
¾” Carriage Bolt (#109),
∅
¾” Washer (#124), and M10 Aircraft Nut (#128).
F.) Securely tighten all Bolts and Nuts.
8
Содержание MACH V
Страница 4: ...HARDWARE PACK 3 ...
Страница 5: ...HARDWARE PACK 4 ...
Страница 6: ...HARDWARE PACK 5 ...
Страница 7: ...HARDWARE PACK 6 ...
Страница 17: ...16 ...
Страница 20: ...DIAGRAM 11 19 ...
Страница 22: ...DIAGRAM 12 21 ...
Страница 25: ...24 ...