STEP 7 (See Diagram 7)
A.) Attach the 121” Cable (#50) to the top of the Upper Frame (#2). Attach a Pulley (#60) and
two Pulley Covers (#61) to the beginning of the Cable. Secure it to the front open slot on the
Upper Frame with one M10 x 2 3/8” Hex Bolt (#68), two
∅
13/16” Flat Washers (#75), and
one M10 Aircraft Nut (#78).
B.) Draw the Cable towards back of the machine to the open bracket on the Upper Frame.
Install a Pulley with two Pulley Covers. Draw the Cable over the Pulley then insert the Cable
downward through the hole behind the bracket on the top of the Upper Frame.
C.) Attach Pulley (#60) and two Pulley Covers (#61) to the Cable. Attach the Double Floating
Pulley Bracket (#27) to the Pulley set and secure it with one M10 x 2 3/8” Hex Bolt (#68), two
∅
13/16” Flat Washers (#75), and one M10 Aircraft Nut (#78).
D.) Draw the Cable upward towards the bracket underneath the Top Socket Assembly (#7).
Attach one Pulley (#60) to the Cable and secure it to the bracket with one M10 x 2 3/8” Hex
Bolt (#68), two
∅
13/16” Flat Washers (#75), and one M10 Aircraft Nut (#78). (Please note
there is no Pulley Cover needed in this Step)
E.) Pull the Cable downward towards the Selector Stem (#46). Screw the Bolt on the end of the
Cable into the Selector Stem (#46) by at least ½”. Do not screw the Bolt all the way in the
Selector Stem. It may cause the Cable to be too short. Tighten down the nut on the bolt.
10
Содержание APEX
Страница 4: ...3 ...