Impco Mobile Symphony SPM20 Скачать руководство пользователя страница 3

2

email: [email protected], Website: www.impcollc.com

Unpacking the Mobile Symphony.

The unit is shipped with the casters

(wheels), grille and the top tray inside the cabinet.

Grille Installation.

Before attempting to use your new Mobile Symphony

cooler you must complete the grille installation.

Attaching the plastic tray.

Remove the side pad frames from the cooler

by lifting them up and out of the cooler cabinet. Locate the parts bag in the
cooler and attach the tray top using the push rivets provided. (Picture 1)

Installing the casters.

Some models ship with the wheels already

attached to the cabinet bottom. If wheels are not attached then locate the
wheels inside of the cooler and attach them to the cabinet bottom using the
bolts included.

Installing the grille.

Refer to the installation instructions in the grille bag.

Installing the drain bushing and standpipe.

Refer to Figure 2 and

install the drain bushing and standpipe through the hole provided in the bottom of
the cooler.

Installing the float valve and adapter.

Refer to Figure 3 and attach the

float to the side leg of the cooler using the hole provided. The garden hose
adapter attaches to the brass inlet fitting on the float valve. (Picture 2). Verify
that the hose washers are properly in place. Position the pump snug to blower
housing to prevent contact with the pads.

Connecting to Water

.

Move the cooler to an area where it can be filled

with water and drained. The cooler should be located on level ground.
Connect to a water supply using a commercial grade garden hose (supplied by
customer) connected to the adapter on the float valve and turn on the water.
Verify water tight connections by visually examining both the float / hose con-
nection and the drain plug. (Picture 2)

CAUTION: Water inlet pressure should be limited to a
maximum of 105 PSI or an inline pressure regulator
should be installed.

Adjusting the water level.

Refer to Figure 3 and set the water height as

shown by adjusting the float.

Connecting to a Power Supply.

Plug the grounded plug directly into a

120 Volt AC 60 Hz grounded GFCI protected electrical power supply.

Note:

Improper voltage will burn out the motor and pump windings and will void the
warranty.

LOCATION

ASSEMBLY INSTRUCTIONS

TOOLS REQUIRED

• 3/8˝ Open End Wrench

• 3/8˝ Box End Wrench

• 6˝ Adjustable Wrench

• 7/16˝ Box End Wrench

• #2 Phillips Screwdriver

Picture 1

Picture 2

Picture 3

Figure 2

Figure 3

Figure 4

Figure 4

Always make sure the unit is operated on a level surface. When

using indoors, the best location for it is near a partially opened

window or door where hot outdoor air can be drawn into the

unit. This cooler is portable, but use caution when rolling the

unit to avoid splashing and spilling of water. Cool air can best

be directed through the space by using a partly opened window

or door, ideally one that is situated on the opposite side of the

space from the cooler. This allows the cooled air to be moved

through the space and exhausted back outdoors which is

critical to proper performance of the cooler.

!

Figure 5

Push Rivet

Hose Adapter

Drain Bushing

Washer

Cooler Bottom

Lock Nut

Washer Inside
Cap

Cap

Содержание Mobile Symphony SPM20

Страница 1: ...tar problemas en su enfriador La falla en seguir estas instrucciones puede da ar y o afectar la operaci n del enfriador y anular la garant a U S Models SPM20 SPM30 SPM45 CAUTION SAVE AND READ THESE IM...

Страница 2: ...Always unplug the electric cord to your cooler before you work on the cooler Your cooler will run on 120 Volt AC 60 Hz cycle current only Plug into three prong grounded GFCI protected electrical rece...

Страница 3: ...ated on level ground Connect to a water supply using a commercial grade garden hose supplied by customer connected to the adapter on the float valve and turn on the water Verify water tight connection...

Страница 4: ...fting the pad frames up and out of the cooler Remove pump from cooler To prevent breakage carefully release the four snap out tabs and lift impeller base plate from the pump body Picture 5 Use a mild...

Страница 5: ...emblies from the unit lift up pull out and then down Lay the metal side down on a flat surface and remove the pad retainers The aspen filters can now be removed Rinse off pad assembly then install new...

Страница 6: ...email customerservice impcollc com Website www impcollc com 5...

Страница 7: ...is level D Pump not working D Clean or replace pump E Loose water connections E Check for leaks and correct Water draining from cooler 1 Float arm improperly adjusted 1 Adjust float to proper level 2...

Страница 8: ...on any exchange e This specific warranty does not cover evaporative coolers installed and operated outside the continental United States III Do not use cooler cleaners cooler treatments or other addi...

Отзывы: