Locating the immerSUN
Often, the most suitable location for the immerSUN is near to the distribution board as
all the connections required are usually available here.
Alternatively the unit can be mounted next to the load. Note that the
Sensor
clamp must
be clamped around the supply meter-tail. There is the option of using the Wireless
Sensor to simplify the installation if required.
The following should be considered when deciding upon the most suitable location:
●
Close to the main incoming mains electrical supply of the property – otherwise
the Sensor Clamp will need to be extended, or the Wireless Sensor option used.
●
Access to heater supply cable (this is usually at the consumer unit)
●
Access to suitable supply via
16A MCB or 13A fused outlet
●
User access
to the buttons and visibility of LCD screen
●
Adequate ventilation – keep vents clear and provide airflow around the unit.
Mimi mum clearance top and bottom is 50mm
although more is recommend for
ease of access to case screws.
●
Cable access point – through the top, bottom or rear of the unit - the
bottom
panel is removable
to give better access when wiring.
Voltage Optimisers
If there is a voltage optimiser installed at the property, care will need to be taken when
positioning and wiring the immerSUN. The Sensor Clamp and the immerSUN will need to
'see' the same voltage, whether this is the optimised voltage or the non-optimised
voltage.
Check the manufacturers instructions before connecting the immerSUN to an optimised
circuit – some optimisers should not be connected to heaters.
Three-Phase Systems
The immerSUN and the Sensor Clamp must be on the SAME PHASE.
If the generation is 3-phase, an immerSUN can be used on each phase, if only one or two
immerSUN's are used, only one-third or two-thirds of the surplus power will be able to be
utilised. The loads will need to be single phase.
Содержание automatic power controller
Страница 1: ...1 ENGLISH Installation User Guide V1 2...
Страница 11: ...11 Advanced options...
Страница 24: ...Setup...
Страница 25: ...25 Wiring diagrams...
Страница 36: ...36 Wiring Dual Tariff Single Meter...
Страница 44: ...44 4eco Ltd Church View Business Park Binbrook Lincolnshire LN8 6BY England 44 0 1472 398838...