Gas Supply 

The meter and supply pipes must be sized to deliver the gas rate and pressure given on page 3.    The 
boiler requires at least a 22 mm (3/4”) gas supply pipe. 
The complete installation, including the meter, must be tested for gas soundness and purged as described 
in IS 813:2002. 

 

Electrical Installation 

 

The boiler requires a 230V ~ 50 Hz mains supply, fused at 2 A.  Polarity of the supply must not be reversed 
or the boiler will not function properly.  The boiler will not function properly and may be damaged when con-
nected to a generator which does produce a true sine wave type output. 
 

The boiler must be earthed. 

There must only be one common isolator, providing complete electrical isolation, for the boiler and any ex-
ternal controls. 
Using PVC insulated cable not less than 0.75 mm² (24 x 0.2 mm) to BS 6500 Table 16, the boiler should be 
connected to a fused three pin plug and unswitched shuttered socket outlet (both complying with BS 1363), 
or a fused double pole switch with a contact separation of at least 3 mm in both poles. 
Wiring external to the boiler must be in accordance with the current IEE Wiring Regulations. 

General Installation Information 

 

Zeus Maior Control board

35  34                                       33   32

N     L     E

B

ro

w

n

B

lu

e

G

re

e

n

/Y

e

llo

w

Replace link with

volt free contact from CH

controls

NB: Do not connect 220V !

Mains Lead

 

IMPORTANT:  
External controls connected to the boiler must be of the volt free type and are connected to termi-
nals 34 and 35 as shown above

.  

Connection of a voltage to any boiler terminals other than the 

mains lead will result in destruction of the boiler control panel. 
 

Clearances and Air Supply 

The boiler does not require any air vents for cooling in the room in which it is installed or when installed in a 
cupboard or compartment. The minimum clearances for servicing must always be maintained.  Please see 
table on page 3. 

Note: 

A cupboard or compartment used to enclose the boiler must be designed and constructed specifically 

for the purpose. 
 

Содержание Zeus Maior 24

Страница 1: ...ith Unvented Hot Water Storage For technical assistance spare parts or service call RVR Limited Kenmare Co Kerry Tel 064 41344 Fax 064 89520 Read these instructions completely before using or installi...

Страница 2: ...ns These include but may not be limited to the follow ing I S 813 Domestic Gas Installations I S 820 Non Domestic Gas Installations All relevant Building Regulations Local Water Bye Laws IEE Wiring Re...

Страница 3: ...r C 20 60 Hot water storage capacity L 60 Continuous hot water flow rate T 30oC l min 13 9 Boiler weight filled kg 138 Boiler weight empty kg 74 ELECTRICAL Electrical connection v hz 230 50 Nominal Ab...

Страница 4: ...hamber 18 Over temperature Safety thermostat 6 Burner 19 Boiler 316L stainless steel 7 Circulating Pump 20 Domestic Circuit 8 Bar Safety Valve 8 Gas Valve 21 Boiler Drain Valve 9 Motor operated 3 way...

Страница 5: ...e pin plug and unswitched shuttered socket outlet both complying with BS 1363 or a fused double pole switch with a contact separation of at least 3 mm in both poles Wiring external to the boiler must...

Страница 6: ...Over 3 Diaphragm Flue length in metres 44 0 5 47 5 8 None Over 8 Diaphragm Flue length in metres 44 0 17 47 17 24 None Over 24 Flue System When the boiler is installed on an external wall the standar...

Страница 7: ...tical metres Vertical concentric kit 80 125 The exhaust pipe 80 mm is fitted inside the Air intake pipe 125 mm Connection to the boiler is made using a flange 1 The adapter 60 100 80 125 3 is used the...

Страница 8: ...bles The resistance factor varies depending on whether the component in question conveys fresh inlet air or hot combustion gases All boilers have a maximum resistance factor of 100 The sum of all comp...

Страница 9: ...ces Component Resistance Quantity Total 80mm Intake pipe 2 3 9 20 7 90 air intake bend 5 3 15 80mm Flue pipe 3 6 18 90 Flue bend 6 5 3 19 5 73 2 Total Flue Resistance In this case the total resistance...

Страница 10: ...terminal is fitted less than 2 m above a surface to which people have access the terminal must be protected by a terminal guard IMPORTANT Failure to install flue systems correctly may lead to serious...

Страница 11: ...low To check correct operation of the expansion vessel s the system pressure should not be more than 2 5 bar when the system is at maximum operating temperature The boiler is supplied with the followi...

Страница 12: ...2879 must be used to allow the system to be completely drained The heating system should be thoroughly flushed before the boiler is connected and again after the first heating If it is necessary to a...

Страница 13: ...which is present at the top of the 60l storage vessel provides sufficient expansion for the domestic hot water system An optional additional DHW expansion kit is avail able for situations where the in...

Страница 14: ...iven to the installation of an electronically operated device to warn when discharge takes place High Level Termination At high level discharge onto a roof is acceptable pro viding the roof is capable...

Страница 15: ...supply to the boiler Turn main switch 5 to Hot Water or Hot Water Heating N B Once the main switch 5 is turned to the central Heating temperature setting 1 is not active and the domestic water temper...

Страница 16: ...dly contact a qualified technician for assistance Draining the system To drain the boiler use the special drain cock Before draining ensure that the filling valve is not con nected Draining the DHW ta...

Страница 17: ...s on the gauge Ensure activation of the device for protection against the ionisation flame control gas activation time must be less than ten seconds Visually inspect to check for leakage of water or o...

Страница 18: ...Zeus Maior 24 Instructions Zeus Maior 24 Series Variable Heat Output Zeus Maior 24 Wiring Diagram...

Отзывы: