Immergas Zeus Maior 24 Скачать руководство пользователя страница 13

 

 

 

Zeus Maior 24 Instructions 

Mains water pressurised unvented system are generally not permitted in Ireland.  A cold water storage tank 
and a pressure boosting pump will normally provide a pressurised cold water supply.  The pressurisation 
pump should provide a water pressure of between 1 and 3 bar. However, all taps and mixing valves used 
with the hot water system must be suitable for operating at a pressure of up to 5.5 bar. 
To ensure economic use, the pipe runs between the boiler and taps should be in 15 mm copper pipe and be 
as short as possible. Where possible the pipe work should be insulated to reduce heat loss. 
 
Before the cold water supply pipe is connected to the boiler, it should be thoroughly flushed out to avoid the 
danger of dirt or foreign matter entering the boiler. 
The stored water temperature is adjustable to a maximum of 55°C. In hard water areas this should avoid 
possible scale build-up. However, if descaling is necessary contact RVR Limited for guidance. 
 

Unvented Hot Water Storage System

 

The installation is subject to Building Regulations and the Water Bye Laws of the Local Authority.  
The Immergas Zeus Maior 24 boiler is supplied with all the components required for a safe and efficient  
unvented hot water system.  An air cushion which is present at the top of the 60l storage vessel provides 
sufficient expansion for the domestic hot water system.   An optional additional DHW expansion kit is avail-
able for situations where the inlet pressure exceeds 3 bar or other situations where the expansion capacity 
may not be adequate. 

NOTE: In the Dublin City Council area the optional expansion vessel must be fitted to comply with 
the approval requirements of the council. The council also requires that the minimum internal di-
ameter of pipes connected to the boiler DHW connections should not be less that 13mm.  As 1/2” 
thermoplastic pipe does not provide the minimum diameter,  the minimum suitable thermoplastic 
pipe size is 3/4” 
 
Discharge pipe - 

The discharge pipes from the expansion relief valves must be routed to a tundish in 

1/2” (or 15 mm )pipe. The discharge pipe work from both relief valves may be joined together in the same 
sized pipe, providing at least  3/4” (or 22 mm)  pipe work is connected downstream of the tundish. 

Tundish - 

The tundish must be positioned within 500 mm of the appliance, so that it is visible to the User 

and away from electrical devices. The minimum size of the discharge pipe downstream of the tundish is 
given in the following table. 

Zeus Maior Boiler

Booster

pump

Cold

Water

Supply

Optional

Expansion

Vessel

Primary

expansion

valve

DHW

expansion

valve

Divertor

Valve

Expansion volume

Tundish

Check
 Valve

Domestic Hot Water System 

15mm (1/2”) 

          22mm  (3/4”) 

          28mm  (1”) 

          35mm  (11/4”) 

Содержание Zeus Maior 24

Страница 1: ...ith Unvented Hot Water Storage For technical assistance spare parts or service call RVR Limited Kenmare Co Kerry Tel 064 41344 Fax 064 89520 Read these instructions completely before using or installi...

Страница 2: ...ns These include but may not be limited to the follow ing I S 813 Domestic Gas Installations I S 820 Non Domestic Gas Installations All relevant Building Regulations Local Water Bye Laws IEE Wiring Re...

Страница 3: ...r C 20 60 Hot water storage capacity L 60 Continuous hot water flow rate T 30oC l min 13 9 Boiler weight filled kg 138 Boiler weight empty kg 74 ELECTRICAL Electrical connection v hz 230 50 Nominal Ab...

Страница 4: ...hamber 18 Over temperature Safety thermostat 6 Burner 19 Boiler 316L stainless steel 7 Circulating Pump 20 Domestic Circuit 8 Bar Safety Valve 8 Gas Valve 21 Boiler Drain Valve 9 Motor operated 3 way...

Страница 5: ...e pin plug and unswitched shuttered socket outlet both complying with BS 1363 or a fused double pole switch with a contact separation of at least 3 mm in both poles Wiring external to the boiler must...

Страница 6: ...Over 3 Diaphragm Flue length in metres 44 0 5 47 5 8 None Over 8 Diaphragm Flue length in metres 44 0 17 47 17 24 None Over 24 Flue System When the boiler is installed on an external wall the standar...

Страница 7: ...tical metres Vertical concentric kit 80 125 The exhaust pipe 80 mm is fitted inside the Air intake pipe 125 mm Connection to the boiler is made using a flange 1 The adapter 60 100 80 125 3 is used the...

Страница 8: ...bles The resistance factor varies depending on whether the component in question conveys fresh inlet air or hot combustion gases All boilers have a maximum resistance factor of 100 The sum of all comp...

Страница 9: ...ces Component Resistance Quantity Total 80mm Intake pipe 2 3 9 20 7 90 air intake bend 5 3 15 80mm Flue pipe 3 6 18 90 Flue bend 6 5 3 19 5 73 2 Total Flue Resistance In this case the total resistance...

Страница 10: ...terminal is fitted less than 2 m above a surface to which people have access the terminal must be protected by a terminal guard IMPORTANT Failure to install flue systems correctly may lead to serious...

Страница 11: ...low To check correct operation of the expansion vessel s the system pressure should not be more than 2 5 bar when the system is at maximum operating temperature The boiler is supplied with the followi...

Страница 12: ...2879 must be used to allow the system to be completely drained The heating system should be thoroughly flushed before the boiler is connected and again after the first heating If it is necessary to a...

Страница 13: ...which is present at the top of the 60l storage vessel provides sufficient expansion for the domestic hot water system An optional additional DHW expansion kit is avail able for situations where the in...

Страница 14: ...iven to the installation of an electronically operated device to warn when discharge takes place High Level Termination At high level discharge onto a roof is acceptable pro viding the roof is capable...

Страница 15: ...supply to the boiler Turn main switch 5 to Hot Water or Hot Water Heating N B Once the main switch 5 is turned to the central Heating temperature setting 1 is not active and the domestic water temper...

Страница 16: ...dly contact a qualified technician for assistance Draining the system To drain the boiler use the special drain cock Before draining ensure that the filling valve is not con nected Draining the DHW ta...

Страница 17: ...s on the gauge Ensure activation of the device for protection against the ionisation flame control gas activation time must be less than ten seconds Visually inspect to check for leakage of water or o...

Страница 18: ...Zeus Maior 24 Instructions Zeus Maior 24 Series Variable Heat Output Zeus Maior 24 Wiring Diagram...

Отзывы: