9
C12
1
2
5
4
3
1-13
C12
C12
C12
C12
1-14
1-16
1-17
1-15
INS
TALL
AT
O
R
US
ER
MAINTEN
AN
CE
The kit includes:
N°1 - Seal (1)
N°1 - Concentric 90° curve (2)
N°1 - Intake/exhaust concentric pipe
Ø60/100 (3)
N°1 - Internal ring (4)
N°1 - External ring (5)
Horizontal intake kits - exhaust Ø60/100.
Kit
assembly (Fig. 1-13): install the bend with flange
(2) on the central hole of the boiler inserting the
seal (1) and tighten using the screws present in
the kit. Engage the terminal pipe (3) with the
male side (smooth), into the female side (with lip
seal) of the curve (2) until it stops, making sure
the relevant internal and external rings are fitted,
this will ensure hold and joining of the elements
making up the kit.
N.B.:
when the boilers are installed in areas where
very rigid temperatures can be reached, a special
anti-freeze kit is available that can be installed as
an alternative to the standard kit.
• Coupling extension pipes and concentric el-
bows Ø 60/100 snap-fit extensions with other
elements of the fume extraction elements
assembly, follows: fit the concentric pipe or
elbow with the male on the female section
(with lip seal) to the end stop on the previously
installed element. to ensure sealing efficiency
of the coupling.
The Ø 60/100 kit can be installed with the rear,
right side, left side and front outlet.
• Application with rear outlet (Fig. 1-14). The
970 mm pipe length enables routingthrough a
max. thickness 685 mm. Normally the terminal
must be shortened. Calculate the distance by
adding the following: part th internal
proj external projection. The minimum
projectionvalues are given in the figure.
• Application with side outlet (Fig. 1-15); Using
the horizontal intake/exhaust kit, without the
special extensions, the maximum distance
between the vertical exhaust axis and the out-
side wall is 905 mm.
• Extensions for horizontal kit. The horizontal
intake/exhaust kit Ø 60/100 can be extended
up to a max. horizontal distance of 3000 mm
includingthe terminal with grille and excluding
the concentric bend leaving theboiler. This con-
figuration corresponds to a resistance factor of
100. Inthese cases the special extensions must
be requested.
Connection with 1 extension (Fig. 1-16). Max.
distance between vertical boiler axis and exter-
nal wall: mm 1855.
Connection with 2 extensions (Fig. 1-17).
Max. distance between vertical boiler axis and
external wall: mm 2805.
Horizontal intake/exhaust kits Ø 80/125.
Kit
assembly (Fig. 1-18): install the bend with flange
(2) on the central hole of theboiler inserting the
seal (1) and tighten using the screws in the kit.
Fit the male end (smooth) of the adapter (3) up
to the stop on the female end of the bend (2)
(with lip seal). Fit the male end (smooth) of the
Ø 80/125 concentric terminal pipe (4) up to the
stop on the female end of the adapter (3) (with
lip seals),, making sure the relevant internal and
external rings are fitted, this will ensure hold
and joining of the elements making up the kit.
• Coupling extension pipes and concentric
elbows Ø 80/125 snap-fit extensions with
other elements of the fume extraction elements
assembly, follows: fit the concentric pipe or
elbow with the male on the female section
(with lip seal) to the end stop on the previously
installed element; this will ensure correct hold
and joining of the elements.
Important:
if the exhaust terminal and/or
extension concentric pipe needs shortening,
consider that the internal duct must always
project by 5 mm with respect to the external duct.
Normally the horizontal intake/exhaust kit Ø
80/125 is used if particularly long extensions
are required; the kit Ø 80/125 can be installed
with the rear, right side, left side or front outlet.
• Extensions for horizontal kit. The horizontal
intake/exhaust kit Ø 80/125 can be extended
up to a
a maximum horizontal length of 7300
,
including the terminal with grille and excluding
the concentric bend leaving the boiler and the
adapter Ø 60/100 in Ø 80/125 (Fig. 1-19). This
configuration corresponds to a resistance factor
of 100. In this case the special extensions must
be requested.
N.B.:
When installing the ducts, a section
clamp with pin must be installed every 3
metres.
• External grill.
N.B.:
for safety purposes, do not
even temporarily obstruct the boiler intake/
exhaust terminal.
Vertical kit with aluminium tile Ø 80/125.
Kit
assembly (Fig. 1-20): install the concentric flange
(2) on the central hole of the boiler inserting the
seal (1) and tighten using the screws in the kit. Fit
the male end (smooth) of the adapter (3) in the
female end of the concentric flange (2). Imitation
aluminium tile installation. replace the tile with
the aluminium sheet (5), shaping it to ensure that
rainwater runs off. Position the fixed half-shell
(7) on the aluminium tile and insert the intake/
exhaust pipe (6). Fit the male end (smooth) of the
Ø 80/125 concentric terminal pipe (6) up to the
stop on the female end of the adapter (3) (with
lip seals), making sure that the ring is already
fitted (4), this will ensure sealing and joining of
the elements making up the kit.
Содержание ZEUS 24 Superior
Страница 1: ...ZEUS 24 28 kW IE Instruction booklet and warning 1 038761ENG...
Страница 26: ......
Страница 27: ......