1.1  INSTALLATION 

RECOMMENDATIONS.

designed for wall installation only; for heating 

environments and production of domestic hot 

water for domestic use and similar purposes.

-

cessories must have suitable characteristics (both 

technical and structural), in order to allow (al-

- installation (according to the legislation and 

technical standards in force);

- maintenance  operations  (including  those 

scheduled, periodical, ordinary and special);

- removal (to the outdoors in a place suitable 

for loading and transporting appliances and 

components) as well as any replacement with 

equivalent appliances and/or components.

protrusions or recesses enabling access to the 

By  varying  the  type  of  installation  the 

Type C boiler

 if installed using concentric 

pipes or other types of pipes envisioned for 

the sealed chamber boiler for intake of air and 

expulsion of fumes.

Only professionally enabled heating/plumbing 

technicians are authorised to install Immergas 

gas appliances.

Installation must be carried out according to 

regulation standards, current legislation and in 

compliance with local technical regulations and 

the required technical procedures.

Installation of the HE 30 COMBI INT / EXT

boiler  when  powered  by  LPG  must  comply 

with the rules regarding gases with a greater 

density than air.   Before installing the appliance, 

ensure that it is delivered in perfect condition; 

if in doubt, contact the supplier immediately. 

Packing materials (staples, nails, plastic bags, 

polystyrene foam, etc.) constitute a hazard and 

must be kept out of the reach of children. Keep 

(paper, rags, plastic, polystyrene, etc.). In the event 

of malfunctions, faults or incorrect operation, 

modify or repair the appliance alone.

Failure to comply with the above implies personal 

responsibility and invalidates the warranty.

 Installation Standards:

All installation must comply with AS 5601.

Attention

: wall mounting of the boiler must 

generator.

 they only 

ensure adequate support if inserted correctly 

(according to technical standards) in walls made 

of solid or semi-hollow brick or block. In the 

case of walls made from hollow brick or block, 

partitions with limited static properties, or in any 

case walls other than those indicated, a static test 

must be carried out to ensure adequate support.

N.B.: the hex head screws supplied in the blister 

mounting bracket to the wall.

boiling temperature in atmospheric pressure. 

system  and  hot  water  circuit  suited  to  their 

performance and capacity.

SI

NO

1-1

YES

NO

M

P

D

W

I

j

j

j

h

h

k

k

h

f

c

a

c

e

e

d

k

g

T

b

T

g

T

Flue terminal positions

D      

Door

I       

Mechanical air inlet

M     

Gas meter

T      

Flue Terminal

W    

Window

 

Flue terminal positions.  Shaded area indicates prohibited area

Ref.

 

Item 

    

 

Min. Clearance

      

 

mm

 

Below eaves, balconies and other projections (Appliances over 50MJ/h) 

 

300 

From the ground, above a balcony or other surface 

 

 

300 

From a return wall or external wall 

 

 

 

300 

From an electricity meter or fusebox/breaker panel 

 

 

500 

From a drain pipe or soil pipe  

 

 

 

75 


 

300 

Horizontally from any opening window, door, non-mechanical air inlet or other 

300

 

 

From a mechanical air inlet including a spa blower 

 

 

1000 

Vertically below an opening window, non-mechanical air inlet or any other opening 

500 

 

 

 

 

    clearances shown on this page.
    If you are unsure about clearances not indicated here,
    in general refer to AS 5601 or your local autority.

•  

All measurements are the minimum clearances

    required.

•  

Terminals must be positioned so to aviod combustion

    products entering the building.

Hunt Heating technical

From a gas meter 

   

 

1000 

Содержание HE COMBI EXTERNAL

Страница 1: ...HE COMBI INTERNAL EXTERNAL INSTRUCTION INSTALLATION USER MANUAL Wall Mounted Heating Only Boiler ...

Страница 2: ...for installation use and maintenance stages sites environment protection injury prevention comply with the laws in force and technical standards hed by the Law Installation and maintenance must be performed in compliance with the regulations in force according to the manufacturer s instructions and Improper installation or assembly of Immergas appliance and or components accessories kit and device...

Страница 3: ...n to another type of gas 16 3 6 Possible adjustments 16 3 7 Programming the P C B 16 3 8 Automatic slow ignition function with timed ramp delivery 18 3 9 Chimney sweep function 18 3 10 Pump anti block function 18 3 11 three way anti block system 18 3 12 Radiators anti freeze function 18 3 13 P C B periodical self check 18 3 14 Casing removal 19 3 15 Yearly control and maintenance of the appliance ...

Страница 4: ...incorrect operation modify or repair the appliance alone Failuretocomply withtheaboveimpliespersonal responsibility and invalidates the warranty Installation Standards All installation must comply with AS 5601 Attention wall mounting of the boiler must generator they only ensure adequate support if inserted correctly according to technical standards in walls made of solid or semi hollow brick or b...

Страница 5: ...mperature in the boiler falls below 4 C the boiler is correctly connected to gas and electricity power supply circuits the boiler is powered constantly the boiler is not in no ignition block Par 2 5 the boiler essential components are not faulty In these conditions the boiler is protected against freezing to an environmental temperature of 5 C Minimum temperature 15 C If the boiler is installed in...

Страница 6: ...malies temperature to be adjusted to the actual needs of the room being heated in order to obtain the desired room temperature with extreme precision and therefore with evident saving in directly by the boiler by means of the same 2 wires used for the transmission of data between boiler and chrono thermostat Comando Amico Remoto remote control V2 CARV2 Optional the voltage from the appliance Any C...

Страница 7: ...of pipe of the same diameter the so called equivalent length obtained from the ration between the relative Resistance Factors All boilers have an experimentally obtainable maximum Resistance Factor equal to 100 e maximum Resistance Factor allowed corresponds to the resistance encountered with the maximum allowed pipe length for each calculations to be made to verify the possibility Positioning of ...

Страница 8: ...t 21 m 1 3 Intake m Exhaust m Concentric bend 45 Ø60 100 Intake and Exhaust 16 5 m 1 Intake m Exhaust m Terminal complete with concentric horizontal intake exhaust Ø60 100 Intake and Exhaust 46 m 2 8 Intake m Exhaust m Concentric horizontal intake exhaust terminal Ø60 100 Intake and Exhaust 32 m 1 9 Intake m Exhaust m Terminal complete with concentric vertical intake exhaust Ø60 100 Intake and Exh...

Страница 9: ...oiler positioning the gasket 1 which does not require lubrication with the circular projections downwards in the screws present in the kit Imitation aluminium tile installation replace the tile with the aluminium sheet 4 shaping it to half shell 6 and insert the intake exhaust pipe 5 Fit the Ø60 100 3 concentric terminal pipe up to the stop making sure that the wall sealing and joining of the elem...

Страница 10: ...nents No 1 No 1 No 1 90 concentric bend 4 No 1 90 concentric bend exhaust gasket 5 No 1 90 concentric bend intake gasket 6 No 1 Gasket 8 No 1 External wall sealing plate 9 No 1 Concentric intake exhaust terminal Ø 60 100 10 Flue kit complete 60 100 Australia code 3 023633 HE external boilers HE 30 COMBI EXTERNAL The Immergas boiler when exposed to extreme wind conditions will deactivate the gas an...

Страница 11: ...e the concentric intake exhaust pipe 8 with the male end smooth into the female end sure that the external wall sealing plate 7 has on the casing front 2 this will ensure proper sealing and joining of the elements Fit the cover 9 on the casing front 10 using the gasket 11 Mount the casing front 10 referring to Paragr 3 14 Product code 3 023758 available only from Hunt Heating and can be extended t...

Страница 12: ... device is engaged in the event of gas supply failure and check activation time check the intervention of the main switch located upstream from the boiler and in the boiler check that the concentric intake exhaust one of the checks should be negative N B the boiler preliminary check must be carried boiler warranty is valid as of the date of testing user 1 16 CIRCULATION PUMP are supplied with a bu...

Страница 13: ...estic hot water probe 13 Gas valve 14 15 Manometer 16 17 Flow probe 18 Safety thermostat 19 Flue hood 20 Primary heat exchanger 21 Ignition and detection electrodes 22 Burner 23 Air vent valve 24 System expansion vessel 25 3 bar safety valve 26 DHW heat exchanger 27 3 way valve motorised 28 Condensate drain trap 29 By pass System draining valve GAS DHW COLD INLET RETURN FLOW N B Schematic shown he...

Страница 14: ...act with Heating service technician 2 2 GENERAL WARNINGS Never expose the wall mounted boiler to direct vapours from a cooking surface Use of the boiler by unskilled persons or children is strictly prohibited For safety purposes check that the concentric air intake ue exhaust terminal if tted is not blocked If temporary shutdown of the boiler is required proceed as follows a drain the heating syst...

Страница 15: ... second attempt fails eliminate the start up block it is necessary to turn the main switch 12 taking it temporarily to the Reset position or using the Reset key on the CARV2 in inhibited for at least one hour One attempt is gained every hour for a maximum of 5 attempts may be necessary to eliminate the ignition block Or in the event the heat exchanger or the trap are clogged and cannot drain the c...

Страница 16: ...TORE HEATING SYSTEM PRESSURE Periodically check the system water pressure between 1 and 1 2 bar If the pressure falls below 1 bar with cool circuit restore normal pressure using the valve provided by the maintenance technician N B If pressure values reach around 3 bar the safety valve may be activated In this case contact a professional technician for assistance In the event of frequent pressure d...

Страница 17: ...h ensure activation of all adjustment devices ensure production of domestic hot water check ventilation and or aeration of the installation room where provided result do not commission the system 3 1 HYDRAULIC DIAGRAM Key 1 2 Flow limiter 3 Domestic hot water probe 4 System pressure switch 5 Gas valve 6 Burner 7 Sealed chamber 8 Primary heat exchanger 9 Flue hood 10 Fan 11 Flue pressure switch 12 ...

Страница 18: ...e no residues of material blocking the the trap being blocked Check by means of the condensate drain cap that there are no residues Noise due to air in the system Check opening of the hood of the special air vent valve Fig 1 18 Make sure the system pressure and expansion vessel pre charge values are within the expansion vessel must be 1 0 bar the value of system pressure must be between 1 and 1 2 ...

Страница 19: ...AMMING THE P C B for possible programming of several operation parameters By modifying these parameters as described below the boiler can be adapted To access the programming phase proceed as follows position the main switch on Reset for a time between 15 and 20 seconds LED 1 will start At this point re position the general selector on When the programming phase has been to choose the parameter to...

Страница 20: ...ing ramp timer continuous variation Flashing LED slow 65 seconds LED 2 130 seconds LED 3 195 seconds LED 4 260 seconds LED 5 325 seconds LED 6 390 seconds LED 7 455 seconds LED 8 520 seconds LED 9 585 seconds LED 10 650 seconds Standard setting LED 11 Heating switch on delay request from Room thermostat and Comando Amico Remoto remote controlV2 CARV2 case of particular systems e g area systems wit...

Страница 21: ...least once every 3 hours for 2 5 minutes 3 11 Both in domestic hot water and in domestic hot water central heating phase the boiler is equipped with a function that starts the three in operation running it for a full cycle so as to reduce the risk of the three way group becoming blocked due to prolonged inactivity 3 12 FUNCTION If the system return water is below 4 C the boiler starts up until rea...

Страница 22: ... from the lateral hooks 4 and upper ones 5 Det B Det A 3 16 VARIABLE HEAT POWER N B the pressures indicated in the tables between the gas valve outlet and the combustion remove the sides 6 by loosening the screws 7 and pulling towards yourself to free the side from the seat 8 Fig 3 5 carried out using a di erential manometer small U shaped column or digital manometer with the probes inserted in th...

Страница 23: ...osen the two screws 2 remove the front 3 of the boiler by pushing it upwards and at the same time pull it towards yourself to release it from the upper pins 4 remove the lower protection plate 5 by loo sening the two screws 6 remove the upper right bracket 7 by loo sening the upper screw 8 and pushing it to remove it from the screw with stop 9 remove the casing side 10 by loosening the screws 11 a...

Страница 24: ...ated in the tables between the gas valve outlet and the combustion carried out using a di erential manometer small U shaped column or digital manometer with the probes inserted in the pressure test gas valve outlet and on the sealed chamber positive Key 1 Modulating Coil 2 Minimum power adjustment nut 3 Maximum power adjustment nut 4 Gas valve outlet pressure point 5 Gas valve inlet pressure point...

Страница 25: ...perature C 35 85 System expansion vessel total volume l 5 1 Expansion vessel factory set pressure bar 1 Pressure relief setting bar psi 3 44 Expansion vessel capacity L 10 Water content in generator l 4 0 Head available with 1000 l h flowrate kPa m H2 O 30 2 3 1 Internal pump head kPa Hot water productionheatoutput MJ h kW 126 34 9 Speci c ow rate t25o C l min 20 Domestichot watercircuit max worki...

Страница 26: ...a plate Gas Type Natural Gas LPG Internal External Gas pressure Settings Central Heating Adjusted output setting Max kPa kW New Existing System FLUSHED before instal lation of boiler Yes Water treatment No Yes Product Qty Used Litres System Volume Litres Dilution rate Litres per 100 litres Installer Details Company Address City State Postcode Installer Name PIC Licence No Commissioning completed D...

Страница 27: ...e system heats up 11 Check that heat is circulating to all radiators through the manual or thermostatic radiator valve 12 ture to a mid temperature point se the water temperature to the new setting 13 Check that all radiators are hot all the way up If the radiator is cold at the top then there is usually air in the radiator Bleed the radiator Balance the system so that all radiators are hot as acc...

Страница 28: ...y Contact phone number Work Completed Note 6 SERVICE RECORDS Handover Instructions No Description when done 1 Fill in all the details on this Boiler manual 2 Instruct the owner users on the correct operation of this heating system this includes how to 3 4 ple fault resolution i e power on 5 How to check and remove air in the radiators Give them a bleed key 6 7 Recommend that the boiler should be s...

Страница 29: ...Contact phone number Work Completed Note Service 6 year 5 Date Service technician Name PIC Licence No Service Company Contact phone number Work Completed Note Service 7 year 6 Date Service technician Name PIC Licence No Service Company Contact phone number Work Completed Note 31 ...

Страница 30: ...Contact phone number Work Completed Note Service 6 year 8 Date Service technician Name PIC Licence No Service Company Contact phone number Work Completed Note Service 7 year 9 Date Service technician Name PIC Licence No Service Company Contact phone number Work Completed Note 32 ...

Страница 31: ......

Страница 32: ...Cod 1 034245 rev 15 038552 001 04 2013 AS 4552 Cert GAS40003 SAI Global Hunt Heating reserves the right to modify its products and ...

Отзывы: