3.2 YEARLY CONTROL AND
MAINTENANCE OF THE STORAGE
UNIT.
The following checks and maintenance should
be performed at least once a year.
- Visually check for water leaks or oxidation
from/on connections;
- Check visually that the safety and control
devices have not been tampered with and in
particular:
- adjustment probes;
- expansion vessel;
- domestic hot water side safety valve;
- Check integrity of the storage tank sacrificial
anodes;
- In the case of particularly hard water, decalci-
fication of the storage tank is recommended
at least once a year. To perform this operation
the tank must be emptied through the draining
valve and then remove the flange in order to
access the inside and use a plastic or wooden
spatula to remove the most resistant deposits
and then clean and rinse with a jet of water.
- During the cleaning phase pay particular at-
tention not to damage the internal protection
of the tank.
3.3 STORAGE UNIT TECHNICAL DATA.
INOXSTOR 200
INOXSTOR 300
INOXSTOR 500
Hydraulic performances
Storage tank unit capacity
l
202,6
279
480,3
Domestic hot water side maximum pressure
bar
8
8
8
DHW side maximum temperature
°C
99
99
99
Maximum coil pressure
bar
6
6
6
Central heating side maximum temperature
°C
90
90
90
Empty storage tank unit weight
kg
60,7
75,0
101,0
Full storage tank unit weight
kg
274,9
366,1
598,9
Heat dispersion
kW h / 24 h
1,95
2,18
2,41
Psbsol
W/K
1,81
2,02
2,23
Upper coil
Exchange surface
m
2
0,72
0,8
1,23
Coil capacity
l
4,1
4,6
7,0
Exchange power
kW
32,0
32,0
32,0
Primary fluid flow rate
l/h
1630
1655
1845
Primary fluid T delta
°C
17
17
14,9
Useful reintegration power
kW
26,3
26,3
26,3
Lower coil
Exchange surface
m
2
1,3
1,31
1,84
Coil capacity
l
7,5
7,5
10,6
Exchange power
kW
52,0
52,0
52,0
Primary fluid flow rate
l/h
2950
3080
3057
Primary fluid T delta
°C
15
14,5
14,6
Useful reintegration power
kW
34,3
34,3
34,3
- On completion of the operation, re-mount the
flange by applying the gasket (replace it with a
new one if it is damaged), close the draining
valve and fill the tank, checking that there are
no leaks from the flange or the valve.
Содержание 3.027746
Страница 1: ...Instruction and recommendation booklet IE INOXSTOR 200 300 500 V2 Storage tank 1 041259ENG ...
Страница 2: ......
Страница 13: ...13 ...
Страница 14: ...14 ...
Страница 15: ...15 ...