background image

6

1-3

INS

TALL

AT

O

R

US

ER

 MAINTEN

AN

CE TECHNI

CI

AN

Attention:

 wall mounting of the boiler must 

guarantee stable and efficient support for the 

generator.

The plugs (standard supply) are to be used only in 

conjunction with the mounting brackets or fixing 

template to fix the appliance to the wall;

 they only 

ensure adequate support if inserted correctly 

(according to technical standards) in walls made 

of solid or semi-hollow brick or block. In the 

case of walls made from hollow brick or block, 

partitions with limited static properties, or in any 

case walls other than those indicated, a static test 

must be carried out to ensure adequate support.

N.B.: the hex head screws supplied in the blister 

pack are to be used exclusively to fix the relative 

mounting bracket to the wall.

These boilers are used to heat water to below 

boiling temperature in atmospheric pressure.

They must be connected to a central heating 

system and hot water circuit suited to their 

performance and capacity.

They cannot be connected directly to low-

temperature systems.

1.3  GAS CONNECTION.

Our boilers are designed to operate with methane 

gas (G20) and LPG. Supply pipes must be the 

same as or larger than the 3/4”G boiler fitting. 

Before connecting the gas line, carefully clean 

inside all the fuel feed system pipes to remove any 

residue that could impair boiler efficiency. Also 

make sure the gas corresponds to that for which 

the boiler is prepared (see boiler data-plate). If 

different, the appliance must be converted for op-

eration with the other type of gas (see converting 

appliance for other gas types). The dynamic gas 

supply (methane or LPG) pressure must also be 

checked according to the type used in the boiler, 

as insufficient levels can reduce generator output 

and cause malfunctions.

Ensure correct gas cock connection by follow-

ing the mounting instructions illustrated in 

the figure. The gas supply pipe must be suitably 

dimensioned according to current regulations in 

order to guarantee correct gas flow to the burner 

even in conditions of maximum generator output 

and to guarantee appliance efficiency (technical 

specifications). The coupling system must con-

form to standards.

Fuel gas quality.

 The appliance has been de-

signed to operate with gas free of impurities; oth-

erwise it is advisable to fit special filters upstream 

from the appliance to restore the purity of the gas.

Storage tanks (in case of supply from LPG 

depot).

- New LPG storage tanks may contain residual 

inert gases (nitrogen) that degrade the mixture 

delivered to the appliance casing functioning 

anomalies.

- Due to the composition of the LPG mixture, 

layering of the mixture components may occur 

during the period of storage in the tanks. This 

can cause a variation in the heating power of 

the mixture delivered to the appliance, with 

subsequent change in its performance.

1.4  HYDRAULIC CONNECTION.

Important:

 In order not to void the warranty 

before making the boiler connections, carefully 

clean the heating system on the primary heat 

exchanger (pipes, radiators, etc.) with special 

pickling or de-scaling products to remove any 

deposits that could compromise correct boiler 

operation.

A treatment of the heating and water system wa-

ter is required, in compliance with the technical 

standards in force, in order to protect the system 

and the appliance from deposits (e.g. scale), 

slurry or other hazardous deposits.
Hydraulic connections must be made in a 

rational way using the couplings on the boiler 

template. The boiler safety valve outlet must be 

connected to an appropriate drain. Otherwise, 

the manufacturer declines any responsibility in 

case of flooding if the drain valve cuts in.

Attention:

 the manufacturer declines all liability 

in the event of damage caused by the installation 

of an automatic filling system .
In order to meet the system requirements es-

tablished by the technical regulation in force in 

relation to the pollution of drinking water, we 

recommend installing the IMMERGAS anti-

backflow kit to be used upstream of the cold 

water inlet connection of the boiler. It is also 

recommended that the heat transfer fluid (e.g. 

water + glycol) entered in the primary circuit 

of the boiler (heating circuit), complies with the 

local regulations in force.

Important: 

to preserve the duration of appliance 

efficiency features, in the presence of water whose 

features can lead to the deposit of lime scale, 

installation of the “polyphosphate dispenser” kit 

is recommended. 

1.5  ELECTRICAL CONNECTION. 

The Mini Nike X 24 3 E boiler has an IPX4D 

protection rating for the entire appliance. Elec-

trical safety of the unit is reached when it is cor-

rectly connected to an efficient earthing system 

as specified by current safety standards.

Important:

  the manufacturer declines any 

responsibility for damage or physical injury 

caused by failure to connect the boiler to an 

efficient earth system or failure to comply with 

the reference standards.
Also ensure that the electrical installation 

corresponds to maximum absorbed power 

specifications as shown on the boiler data-plate. 

Boilers are supplied complete with an “X” type 

power cable without plug. The power supply 

cable must be connected to a 230V ±10% / 

50Hz mains supply respecting L-N polarity and 

earth connection 

. This network must also 

have an omnipolar circuit breaker with class III 

over-voltage category. When replacing the power 

supply cable, contact an authorised company (e.g. 

Authorised Technical After-Sales Service). The 

power cable must be laid as shown. In the event 

of mains fuse replacement on the P.C.B., use a 

2A quick-blow fuse. For the main power supply 

to the appliance, never use adapters, multiple 

sockets or extension leads.

1.6  REMOTE CONTROLS AND 

ROOM CHRONOTHERMOSTATS 

(OPTIONAL).

The boiler is prepared for the application of room 

chronothermostats or remote controls, which are 

available as optional kits. (Fig. 1-3)

All Immergas chronothermostats can be con-

nected with 2 wires only. Carefully read the 

user and assembly instructions contained in the 

accessory kit.
• On/Off digital chrono-thermostat. The chro-

no-thermostat allows:

  -  set two room temperature value: one for day 

(comfort temperature) and one for night 

(reduced temperature);

  - set a weekly programme with four daily 

switch on and switch off times;

  - selecting the required function mode from 

the various possible alternatives:

• manual mode (with adjustable temperature).
• automatic mode (with set programme).
•  forced automatic mode (momentarily changing 

the temperature of the automatic programme).

  The chrono-thermostat is powered by two 1.5V 

LR 6 type alkaline batteries.

• “Comando Amico Remoto” remote Control 

Device

V2

 (CAR

V2

) with climate chronother-

mostat function. In addition to the functions 

described in the previous point, the CAR 

panel

V2

 enables the user to control all the 

important information regarding operation 

of the appliance and the heating system with 

the opportunity of easily intervening on the 

previously set parameters without having to 

go to the place where the appliance is installed. 

The panel is provided with self-diagnosis to 

display any boiler functioning anomalies. 

The climate chronothermostat incorporated 

into the remote panel enables the system flow 

temperature to be adjusted to the actual needs 

of the room being heated, in order to obtain 

the desired room temperature with extreme 

precision and therefore with evident saving in 

running costs. CAR

V2

 is powered directly by 

the boiler via the same 2 wires that are used 

for data transmission between the boiler and 

the device.

Important:

 If the system is subdivided into zones 

using the relevant kit. the CAR

V2

 must be used 

with its climate thermostat function disabled, i.e. 

it must be set to On/Off mode.

On/Off digital chronothermostat

Comando Amico Remoto remote control

V2

 (CAR

V2

)

Содержание 3.020857

Страница 1: ...MINI NIKE X 24 3 E Instruction booklet and warning IE 1 038792ENG...

Страница 2: ......

Страница 3: ...ions specified in the current regulation and technical standards In compliance with legislation in force the systems must be designed by qualified professionals within the dimensional limits establish...

Страница 4: ...ting 11 2 7 Boiler shutdown 13 2 8 Restore central heating system pressure 13 2 9 System draining 13 2 10 Anti freeze protection 13 2 11 Case cleaning 13 2 12 Decommissioning 13 3 Boiler start up init...

Страница 5: ...e intervenes with an obstructed conveying system the safety valve must be conveyed away by a draining funnel or if there are leaks from the hydraulic connections on the contrary the manufacturer canno...

Страница 6: ...order to meet the system requirements es tablished by the technical regulation in force in relation to the pollution of drinking water we recommend installing the IMMERGAS anti backflow kit to be used...

Страница 7: ...directly to the outside as long as the standard regulations for the flue terminal are respected as well as the existing laws Connection to chimneys or flues The connec tion of the appliances to a chim...

Страница 8: ...started up even if only one of the checks should be negative 1 14 CIRCULATION PUMP The Mini Nike X 24 3 E series boilers are supplied with a built in circulation pump with 3 posi tion electric speed c...

Страница 9: ...ystem filling valve 6 Flue safety thermostat 7 Flow probe 8 Primary heat exchanger 9 Safety thermostat 10 Combustion chamber 11 Ignition and detection electrodes 12 System expansion vessel 13 Burner 1...

Страница 10: ...is also prohibited in the same room as suction devices or the like at the same time as the boiler unless there are additional openings dimensioned in a way to satisfy the additional requirement for a...

Страница 11: ...The flow temperature can be modified by selecting the functioning curve via buttons 5 and 6 selecting a value from 0 to 9 Fig 1 5 With external probe present the relative symbol will appear on the dis...

Страница 12: ...ithout having to be reset 1 20 Parasite flame This occurs in the event of a leak in the detection circuit or an anomaly in the flame control unit Press the Reset button 1 24 Push button control panel...

Страница 13: ...3 bar the safety valve may be activated In this case remove water from an air vent valve of a radiator until 1 bar is reached or ask for as sistance from an authorised company In the event of frequen...

Страница 14: ...ce e g a draught gauge positioned at the exit of the appliance combustion products check that there is no backflow of combustion products into the room even during functio ning of fans ensure activati...

Страница 15: ...ficiency of gas intake circuit Irregular combustion red or yellow flame When the burner is dirty or the boiler lamellar pack is blocked Clean the burner or the boiler lamellar pack Frequent interventi...

Страница 16: ...boiler with storage tank 1 Lighting display Determining how to display illumination Display lighting P2 Range of values which can be set Standard setting 0 Off 1 Auto 2 On 1 Off the display is always...

Страница 17: ...sure to insert the special seal rings supplied in the kit between the gas manifold and the injectors apply voltage to the appliance use the boiler push button control panel to select the gas parameter...

Страница 18: ...tion phase the P C B supplies constant gas with pressure proportional to the parameter G2 set 3 10 CHIMNEY SWEEP FUNCTION When activated this function forces the boiler to variable output for 15 minut...

Страница 19: ...itate boiler maintenance the casing can be completely removed as follows Fig 3 4 3 5 1 Unhook the decorative frame a from the relative lower retainers 2 Remove the decorative frame a from the casing c...

Страница 20: ...20 3 5 4 4 5 6 6 d d c INSTALLATOR USER MAINTENANCE TECHNICIAN...

Страница 21: ...tion time must be less than 10 seconds Visually check for water leaks or oxidation from on connections Visually check that the water safety drain valve is not blocked Check that after discharging syst...

Страница 22: ...760 1 89 6 42 65 5 1 41 13 43 137 0 1 38 17 27 176 1 15 0 12900 1 77 5 70 58 1 1 32 12 00 122 4 1 30 15 43 157 3 14 0 12040 1 66 5 02 51 2 1 24 10 65 108 6 1 22 13 68 139 5 13 0 11180 1 55 4 39 44 8 1...

Страница 23: ...1 20 Heat loss at flue with burner On Off 6 70 0 09 Central heating circuit max operating pressure bar 3 Central heating circuit max operating temperature C 90 Adjustable central heating temperature C...

Страница 24: ...er CHK Check Cod PIN PIN code Type Type of installation ref CEN TR 1749 Qnw min Minimum heating capacity domestic Qn min Minimum heating capacity heating Qnw max Maximum heating capacity domestic Qn m...

Страница 25: ...25...

Страница 26: ...26...

Страница 27: ...27...

Страница 28: ...Europe S r o 059051 Poprad Matejovce SK Tel 421 524314311 Fax 421 524314316 IMMERGAS SPA ITALY CERTIFIED COMPANY UNI EN ISO 9001 2015 Design manufacture and post sale assistance of gas boilers gas wat...

Отзывы: