____________________________________________________________________________________
STI S.r.l. – Via Dei Caravaggi 15, 24040 Levate (BG) – ITALY www.imi-critical.com
Manual 5100, rev. 06 06/2020 – RTC/RTCS
- 6 -
5
INSTALLATION
5.1 Transport
Important: The lifting and handling should be made by qualified staff and in compliance
with the laws and provisions in force.
Warning: Lift the actuator as shown in Fig.2.
The fastening points are appropriate for the lifting of the actuator alone and not for
the valve + actuator assembly.
Warning: Avoid that during the handling, the actuator passes above the staff.
The actuator should be handled with appropriate lifting means.
The weight is reported on the delivery bill and on overall-dimensions drawings
furnished with the documents accompanying the actuator.
For base actuator dimensions and weights please consult www.stiactuation.com
Fig. 2 – Lifting points for RTC/RTCS actuator series
Important: Not performing the following procedures will invalidate the product guarantee.