/
/PP
PD[PP
PD[
PP
0LQ
PD[
PP
a
PP
12
2.
))%
a
5.Install steel frame
Adjust the adjustable feet
to the correct height
Adjust the level and height of the steel frame,
and mark the position to drill the hole.
Drill hole,hit plastic nail into the hole,
fix the steel frame by screw.
6.Install flush pipe
①
pipe installed above the floor
Fix the pipe bracket with two screws,fix the flush
bend pipe wth the pipe clip.
The way of connect the flush
bend pipe:
HDPE plastic: weld the flush bend pipe by heated steel board,
connect the flush bend pipe and flush pipeline by rubber tie-in.
ABS plastic: smear glue onto the flush bend pipe,connect the
flush bend pipe and flush pipeline by rubber tie-in.
7.Install fill water pipe
Remove the screws out
from the panel board.
8.Preparative before build wall
9.Build the wall
10.Install cistern panel
The flush bend pipe can be turned
to a suitable position according to
requirement.
Attention: There may be dirt in the new pipe,pls repeat open and close the stop valve several times,
flush out the dirt by open & close the water source several times,till appear clean water.At the same time,
pls wash the dirt in the cistern.
Catch the panel board,pull it
upward and take it out at an angle.
The surface of expanding rod is
5mm lower than the wall surface.
Fix the panel frame onto the
expanding rod by screw.
Adjust the outer part of
rod to be about 28mm.
Fit the bottom of cistern panel onto the
panel frame,push the cistern panel upward,
close the cistern panel onto the panel frame.
13.Install effect
11.Adjust straight pipe
Measure the length of L+3mm at the edge of
straight pipe and cut it down.Rub the cut edge
of straight pipe by file to make it smooth.
Smear silicon oil onto the sealed rubber
of bend pipe equaly,insert straight pipe
into the bend pipe.Adjust the length of
hanging pole,make the length of outside
wall to be L+20mm.Fix the hanging pole
by screw.
Insert the straight pipe into the bend
pipe,make mark on the pipe where
is balance to the wall.
Insert the straight pipe into the hole of wall
hung pan,make mark on the pipe where is
balance to the surface of wall hung toilet.
Measure the distance
between the two marks.
Measure the depth " L" of hanging hole of
wall hung toilet,smear small white cement
onto the side surface of wall hung toilet
where connecting to the wall.
Install the wall hung toilet onto the hanging pole,
set decorated ring,gasket,screw & decorated cap
onto the hanging pole orderly.
Smear glass glue onto the side of
wall hung toilet where connecting
to the wall.
12.Install wall hung toilet
/PP
/PP
mark
/PP
/PP
PP
45°
the cut part
Press the four knot and
take out the square cover
Connect the fill water pipe with
angle iron and connect the metal
soft pipe with angle iron
Insert the panel board
to the knot at an angle
Insert the two hooks of panel
board into the flush the valve
Fit the panel board
with the screw tightly
Put the square cover on
(to prevent the dirty and
prevent the deformation)
The interval of tile and
the square cover no
bigger than 5mm
Cover the system
of concealed cistern
by plasterboard or
composite board.
Stick tile onto the
finished wall. the
range of tile thickness
is 20mm
0mm
Cut the part which over laps
from the flat with the wall
②
pipe installed under the floor
CF01
Wall hung WC bowl frame system with
chrome dual flush plate