7.Install fill water pipe
Loosen the screws and
removefrom the panel
board.
Attention: There may be debris in the new pipe,pls repeat open and close the stop valve several times,
flush out the dirt by open & close the water source several times,till appear clean water.At the same time,
pleases wash the dirt from the cistern.
Remove the panel board,pull
it upward and take it out at an
angle.
6.Install flush pipe
The way of connect the flush bend pipe:
HDPE plastic: weld the flush bend pipe by heated steel board,connect the flush
bend pipe and flush pipeline by rubber tie-in.ABS plastic: smear glue onto the
flush bend pipe,connect the flush bend pipe and flush pipeline by rubber tie-in.
pipe installed above the floor
pipe installed under the floor
Fix the position of flush bend pipe according to the height of Y
which had measured,turn the flush bend pipe as needed.
connect the flush bend pipe with flush straight pipe ,fix the
flush bend pipe with linker.
8.Preparative before build wall
Insert the two hooks of panel
board into the flush valve.
9.Build the wall
10.Install cistern panel
The surface of expanding pole is
5mm lower than the wall surface.
Fix the panel frame onto the
expanding pole by screw.
Adjust the
outer part of
pole to be
about 28mm.
Fasten the bottom of cistern
panel onto the panel frame,
push the cistern panel upward,
close the cistern panel onto the
panel frame.
11.Adjust straight pipe
Measure the length of L+3mm at the edge of
straight pipe and cut it down.Rub the cut edge
of straight pipe by file to remove rough edge.
Insert the straight pipe into the bend
pipe,make mark on the pipe where
is balance to the wall.
Insert the straight pipe into the hole of standing
floor toilet,make mark on the pipe where is
balance to the surface of standing floor toilet.
Measure the distance
between the two marks.
L1mm
L2mm
mark
L1+3mm
L2+3mm
1.5mm
45°
the cut part
Smear silicon oil onto the sealed rubber
of bend pipe equaly,insert straight pipe
into the bend pipe.
Measure the depth " L" of hanging hole of
standing floor toilet,smear small sealant
onto the side surface of standing floor toilet
where connecting to the wall.
Install the standing floor toilet onto the hanging pole,
set decorated ring,gasket,screw & decorated cup
onto the hanging pole orderly.
Smear silicone glue onto the side of
standing floor toilet where connecting
to the wall.
12.Install standing floor toilet
13.Install effect
Press the four knot and take
out the square cover
Connect the fill water pipe with angle iron and
connect the metal flexible pipe with angle iron
(If the flush valve can not stop water,
maybe is the pole too long;if the flush
valve flush volume too small,maybe is
Cut the part which is
protruding of tile flat
with the wall
The interval of tile and
the square cover no
bigger than 5mm
Cover the system of
concealed cistern by
plasterboard or
composite board.
Stick tile onto the
finished wall. The thickness
range of tile onto the finished
wall is 20mm~70mm.
Insert the panel board into the
cavity at an angle
Twist the panel board
with screw tightly
Cover the square cover
(to prevent the dirty and
prevent the deformation)
CC100
F
Super slim concealed insulated cistern with chrome front
mounted dual flush plate
the pole is too short)