![IMC CRONOSflex Скачать руководство пользователя страница 28](http://html1.mh-extra.com/html/imc/cronosflex/cronosflex_getting-started_2045702028.webp)
imc CRONOSflex Getting Started Version 1.8 - 08.01.2014
Getting started
28
2.4 imc CRONOSflex Module attachment mechanism
Stacking of the imc CRONOS
flex
Modules
1. Hook tongue into the groove
2. Press modules together
You will here a "clicking" sound after
successfully connecting the modules.
The Click Mechanism and extruded aluminum case provide a firm mechanical
and electrical connection. As a result, no mainframe or rack is needed.
Detaching modules from the stack
1. Detaching
2. Pull tongue out of groove
Note
A maximum length of 85 cm of attached (clicked) modules should not be passed,
example: a standard base unit with 20 CRFX/ISO2-8 modules.
Mounting elements can be used for more stability.
The sizes (drawings) of all available modules are listed in a separate document (data sheet). The
dimensions, the distances of the bore holes for available mounting elements are also stated in this
separate document.
Be aware that during a running measurement, modules should not be disconnected from the system
(hot plug functionality is not supported during a running measurement).
Содержание CRONOSflex
Страница 45: ...imc CRONOSflex Getting Started Version 1 8 08 01 2014 DSUB 15 Pin configuration 45 3 3 2 Special connector ...
Страница 46: ...imc CRONOSflex Getting Started Version 1 8 08 01 2014 Connection with connectors 46 3 3 3 TEDS connector ...
Страница 49: ...imc CRONOSflex Getting Started Version 1 8 08 01 2014 DSUB 9 plugs 49 3 4 1 6 ARINC Bus DSUB 15 ...